Loading...
2002_0513 WATER Issued: S) )01. Finished 5113 J Employee: Grid Map: Name: Address: Phone Number (HM): (WK) Check For: Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Ronk Maintenance 4. Other Backflow Insp. A Main Line A. Pump 'A. Line Locate Bllow Cert. Date B. Valves B. Water Tower B. Line Locate Re - Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape ff D. Lights E. Other REQUEST FOR SERVICES: (' VC.4c ttlefr4eQ 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # C 1 ? 2)00 A Reading /bO B. New Meter i# t QA' Reading (X C. Old Meter Size / Type BP,GEt. New Meter Size / Type 1A� E. Type of work performed or Endings: 9. if mainline or deep service repay, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. if you had an accideno'incident while performing this request, did you repor•, it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL / / 14. How many trips to do task? , Signature