Loading...
2002_0514 WATER Issued: Finished 5 107 , Employee: Grid Map: Name: Address: s Les Li e, Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. e$oazr' 3. Maintenance 4. Oth Backflow Insp. A. Main Line A. Punip • - A. Line Locate Bk±low Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: eL 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO • C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # q C I ZZX clC S Reading 2( (,41 B. New Meter # 2 ( 4I 6 1 O Reading T C. Old Meter Size / Type New Meter Size / Type '- U.L E. Type of work performed or Endings: _ 9. [f mainline or deep service repa.r, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident incident while performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? 46AL I MSS' Signature