Loading...
2002_0514 WATER Issued: 1 141NZ, Finished: 5 l )4 1Employee: Grid Map: Name: Address: y 1 L SL1 E✓ Phone Number (HM): (WK): Check For. Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read L Backflow Insp. 2. B ask 3. Maintenance 4. Qthe' Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: I P "IYelL 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter At q 12Z l 5 Reading B. New Meter # D-G`{ I'-1 q3 Reading e C. Old Meter Size / Type $ ' New Meter Size / Type ' MAST E. Type of work performed or findings: 9. If mainline or deep service repa.r, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. 1t you had an accident,incident chile performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL f 14. How many trips to do task? ,Signature