2002_0322 WATER n
Issued: 3-22- 02 Finished: Employee: �� e kt lte Grid Map:
Name: Watt 1e ill; Address: 414 Harris
Phone Number (HM): •J / (WK):
Check For: Accuracy Test d Meter Leak Check Water Pressure
Initial Meter Relocation Inspections Re -Read
1. Backflow Insp. 2. Repair 3. Maintenance 4. Qty
Backflow Insp. A. Main Line A. Pump A. Line Locate
Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate
Re -Cert. Date C. Service Line C. Samples C. Tap
D. Hydrants D. Equipment D. Excavation
E. Safety
5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other
6, List of Safety Equipment at Site (if applicable):
A. Barricades B. Cones C. Tape D. Lights E. Other
REQUEST FOR SERVICES: CUS(Drn MCI: t sf a&2LLra 9 -test on wile. mfr.
r
" ! ( '}; ? i c d t .., (±tti., tu t u . i *s u, �-O o
7. If Meter / Service Leak, Classify: City Customer
A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons
B. Was Water Metered: YES NO
C. Was Customer Notified: VERBALLY . , '' DOORKNOCKER
8. If Meter Change Out:
A. Old Meter # '7 4 -0— 3 .51 S Reading _3 ' t / C
B. New Meter # )_cr i . ‹,-/ 7 4. Reading t.- r`ir
C. Old Meter Size / Type 5i A alc t 2. New Meter Size / Type c . l'i ler.
E. Type of work performed or findings: Mere i f s t i IA G-
9. If mainline or deep service repair, describe type of pipe or service line and condition: 1111 0
A 10. Man hours: Crew members: 0
11. List materials used:
F.-
•
12. If you had an accident/incident while performing this request, did you report it? YES or 2.
0
z •.
13. Water Utilities meter inspection: PASS or FAIL x •
7 / :' LL
14. How many trips to do task? i. /' . / / "�� / <- -t.i ' .;
S ignature c o
a 0