Loading...
WA9601B-CN 990420 SHIMEK, JACOBS & FINKI,EX, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JoE R. CARTER, P.E. April 20, 1999 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake Road Water Line Alignment Modifications - Wagon Wheel Ranch Tank to North Point Drive Dear Mr. Griffin: As you requested, we have evaluated the work effort required to re-design the Sandy Lake Road Water Line, from the Wagon Wheel Ranch Elevated Storage Tank to State Road. You have explained the re-design is necessary due to unavoidable delays in acquiring the easements required for the project. In order to keep the project moving forward and work towards the goal of completing this critical project prior to the peak water demand period this summer, you have suggested an alternative route for the water line. We understand the new route is to generally follow the north property line of the Wagon Wheel Ranch property over to State Road, then north along the west fight-of-way line of State Road to Sandy Lake Road and the original alignment of the project. The enclosed exhibit shows our understanding of the revised alignment you wish us to use in the re-design of the project. This re-alignment consists of approximately 4,400 linear feet of the project, representing just under 50% of the project currently under construction. We propose to be compensated for our work on the re-design based on actual salary cost times a multiplier of 2.35, with expenses billed at actual invoice amount times 1.15. On this basis, we suggest the City budget in the range of $6,000 to $6,500. This budget estimate includes design and control surveys, designing and drafting of four new plan-profile construction sheets, recalculation of project quantities and preparation of the necessary field change or change order to the construction contract. Mr. Kenneth M. Griffin, P.E. City of Coppell April 20, 1999 Page Number 2 If this amendment to our engineering services agreement for the Wagon Wheel Ranch Elevated Storage Tank and the Sandy Lake Road Water Line meets with your approval, please have one copy of this proposal executed on behalf of the City of Coppell and returned to our office. We are available to discuss this proposal and this project further at your convenience. Sincere yo Gary C./~dricd~.'/'''--~ APPROVED R THE CIT OF COPPELL: Mr. Kenneth M. Griffin, P.E. City of Coppell April 20, 1999 Page Number 2 If this amendment to our engineering services agreement for the Wagon Wheel Ranch Elevated Storage Tank and the Sandy Lake Road Water Line meets with your approval, please have one copy of this proposal executed on behalf of the City of Coppell and returned to our office. We are available to discuss this proposal and this project further at your convenience. APPROVED FOR THE CITY OF COPPELL: By: Date: j:\cledcal\coppell\96-150\lettersXsandlywl.doc Large size drawings and/or maps for this project are being held by the City Secretary's Office for scanning into the imaging system. For access to these documents, contact Paul Palmer or any member of the City Secretary staff including temporary operators.