Loading...
SS9301-CS 940426 (2) KENKO CONTRACTOR6 April 26, 1994 Ginn Corporation 17103 Preston Road 8uite 205, LB 118 Dallas, TX 75248 Attn: Mr. Wayne Ginn, P.E. Re: Grapevine Creek Sewer Trunk Main - Branch I & II Coppell, TX Kenko Job #9306 * Alternate method-tunnelling Dear Sirs: Attached please find a letter from 8outhland Contracting, Inc., requesting permission to change the method and material on certain portions of the remaining sewer pipe to be installed in Bethel Road. As discussed in our meeting of April 21, 8outhland will perform the alternate method at the same unit prices established for micro-tunnelling. Also enclosed is a letter from Michael Bank with Engineered Sewer Products verifying that Vylon pipe would be appropriate for the proposed alternate tunnel liner installation. Finally, please observe the drawing from Site Development Engineering, Inc., for the tunnel liner installation. It should be noted that Southland Contracting will be utilizing both the bore tunnel machine and the micro-tunnel machine on different segments of the remaining work in an attempt to expedite completion of the construction in Bethel Road, east of Denton Tap. Kenko is fully cognizant of its responsibility to install manholes, make appropriate connections, test the lines, backfill the bore pits and replace pavement. If you have any questions, please call. Sincerely, Kenko, Inc. cc: Mr. Garreth Campbell, City of Coppell Mr. Charlie Griffith, 8outhland Contracting, Inc. SOUTHWESTERN DIVISION ~ 16415 Addison Rd., ,Ste. 308 - Dallas, TX 75248 - (2 ! 4) 931-9494 - Fax (2 ! 4) 931-5474 WESTERN DIVISION - Post Of[ice Box 83 ! - Calimesa, California 92320 - (909) 795-256B - Fax (909) 795-1840 CORPORATE OFFICE o ! 694 91 st Avenue - Blaine, Minnesota 55449 - (612) 786-6510 - Fax (612) 786-6602