SS9301-CS 940421 O. . oz 697 76097-0697 April 21 , 1994 9~ [8~7} z95-~98 Dan Frettinger Kenko, Inc. 16415 Addison Road, Suite 308 Dallas, Texas 75248 Re: City of Coppell Tunneling in Bethel Avenue Dear Dan: We are requesting permission to change the method and material on certain portions of the remaining pipe to be installed by the tunnel method. We have tested the soils from the end of the completed installation at Station 105 + 60 to Station 124 + 50 and find that approximately one half of the remaining pipe to be installed could be done using a 48" tunnel boring machine (TBM). Where the TBM would be used, a temporary support system, designed by a professional engineer registered in the State of Texas would be used. PVC pipe, as called for in the specifications, would be installed. It would be secured in place and backfilled with a minimum of 200 PSI foamed grout. We will furnish and install A-Lock adaptors for connecting to the manholes. Ail changes in the pipe type will be done at manholes. By using the proposed alternate method, we will be able to complete the work approximately ninety days sooner, which will no doubt be pleasing to the people living in the area. We hope to receive a positive response to this request today and get this project completed as soon as possible. Sincerely, -- :? ' Charlie Griffith