Loading...
2002_0604 WATER Issued: 41y /07. Finished Employee: Grid Map: Name: Address: I S %oc i(kiAtrrJU Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. &air 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety •• 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: (. CAA -Act P 4- 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # ?0:4 1 ? Reading .;11 7c r B. New Meter # DioctlGA9 Reading 16 C. Old Meter Size / Type 5 g New Meter Size / Type - E. Type of work performed or findings: 9. It mainline or deep service rera, describe type of pipe or service line and condition: 1n n om `r3 1 10. Man hours: Crew members: 1 l . List materials used: E = o x u. o a u. � Z 12. [t you had an accidenr; incident while performing this request, did you report it? YES or 13. Water Utilities meter inspection: PASS or FAIL 2 in ( .z's� 14. How many trips to do task? ri� Z Signature 3 IS" o 0 cts 0. 0 _a_