Loading...
WA9601B-CN 990405 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. April 7, 1999 GARY C. HENDRICKS, P.E. I. C. F1NKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake Road Water Line Change Order Number 1 Dear Mr. Griffin: We are enclosing five copies of change order number 1 to the City's contract with Fox Contractors, Inc. for the construction of the Sandy Lake Road Water Line, from Denton Tap Road to the Wagon Wheel Ranch Elevated Storage Tank. Change Order Number 1 covers the extra work required to re-bore a portion of Denton Tap Road due to the conflict with the existi ' ' ' change order is acceptable, please have all We are available to discuss this project further at your convenience. Enclosure j:\clerical\coppell\96-150\letters\const\k\co lltrc.doc [ l' I CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 1 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE Due to conflict with the existing 16-inch waterline and the proposed 24-inch waterline undemeath the northbound lanes of Denton Tap Road, approximately 40-linear feet of installed 36-inch encasement pipe is to be removed and re-bored at a lower grade. See the attached revised construction drawing. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: No. Description Quantity This C.O. Quantity Unit Unit Price of Change 41 Re-Bore 36" Encasement Pipe due to 0 1 1 L.S. $17,500.00 $17,500.00 Conflict with Existing 16" Waterline ~ Total: ] $17,500.00 Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Revised Contract Amount $929,743.50 D. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 I 0 calendar days ill'- Revised Contract Time aSf calendar days 2.10 j:Xcl~ticalXcopp~llX96-150x.specs~change-o~:o-l.doc (4/2/99)Page 1 of 2 E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 1 to the original contract between themselves, dated December 8, 1998. City of Coppert, Texas Fox Contractors, Inc. :,-wner ~,~ (~;ontract~ By: ~~ By: Date:Z--/7~,~~~-' Date: . -~ ~ j:\clericalkoppellLq6-150~specsXchange-o~t,o-l.doc (4/2/99) Page 2 of 2 NOIES.., LOT 4 ~ ,m'r. stc.o. ~e ~r roE ee'~o~ oe om~e ~ (SEE IgEC~ P~S ~ ~E gECT ~ECI~S) ~ ~ST ' ~O ~ ~ING OR R~NRg PAIRS ~ ~ ~RNE BY 7-11 ~1 0 ~E gC~ Srt 114+~ ~ ~ 2) 0~ ~ ~ ~VADg ~E ~ OR ~NNECBg ~ ~E ~M~ ~ ~ ~ T~ ~/ ~OY ~E ~ ~C~ ~ ~l ST~ I13+~.92 I-2( ~Y Y~ ~RN~ ~ ~ L~B~D ~ I ~ ~ = I~'I~ ~ N 19970.1702 ~ E 1992~07~ 0 ~ 24u ~ UNE E 197~22 ~ l-1~Xl~ T~ ~ ~ V~ ~ ~ N ~1~66 ~ ~ 2-~ D.I. 2-2t D.I. ~ ~ ~l ST~ I17+~ / ~, ~ / F ~ D.W~ A = l'15'~ lr ~ I-2( ~ H~ ~ ~ N 2~1Z2~ ~ ' ~. 15' ~ ' L~F. ~W~ ~ ~ ~ ~ I ~ ~ R~ T.~M. ER. ~e i P.P. ~w~ c~r of ~ St~ ~,,e ~ens end releted ~ec;fScotione ~. ~9~.~ RELD C~NGE NO, 2 4/1/99 ~ 1 495~ T~ ~X %~T.S. ~X~ ! ~ _. ~485 SU~Y U/dr RmO/OB60N TAP 5C4/Z' 1;20' CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE PLAN-PROFILE STA. 110+00 TO STA. 117+88.56 SHIMEK, JACOBS & RNKLEA, LLP. CONSULTING ENGINEERS 0eqa=, 're.as DESIGNED BY:-G,C.K } PRO,[CT:96150 (~ 9.1[~1' NO. I 110+00 111 112 113 114 115+00 116 117 118 ~qAvm e~. S~J. & F. DA1T: 0CT0eCR, 19981111