Loading...
2002_0410 WATER Issued: 1 1/10 / 0 Z Finished: 1 1/10/07.- Employee: Grid map Name: Address: roaci 14i (1 Phone Number. (HM) (WK): Check for. Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. flackflow Insp. 2. Repair 3. Maintenance_ 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety . 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: )42CTEL C, 40-4.1e 0 7. If Meter /Service Leak: Classify: - City: Customer A. Water Lou (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out Unit # Miles Hrs Equipment A. Old Meter # qI e_7117S Reading ,a3e/a.5 B. New Meter # S �. Readingmo C. Old Meter Size/Type: Of D New Meter Size/ Type MA>TC2 E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man - hours: Crew Members. 11. List Materials Used: 12. If you had an accident'Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature (4L1I 2- .r Cif