Loading...
2002_0327 I o o o w b rt WATER X Issued: ] Z )- Finished: ✓ Employee: Al C/06 c3 Grid map: z N ame: Address: j 4 /0 S - lia l /I A Phone N (HM (WK): / �C - 01 Check for: Accuracy test: Meter Leak: Check water pressure: 1 Initial meter relocation inspections Re -read ° 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp A. Main Line A. Pump A. Line Locate I:4 q?S Bow Cert. Date B. Valves B. Water Tower B. Line Locate IT tQj Re - Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equpment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: // 'f' .11 ■• 0 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # 'l22) 7 7 Y Reading ,.O/ 33 , 6/6 3 Jd B. New Meter # 9 9 VP/ ( Reading 0 C. Old Meter Size/Type: 5/A /3 R4 P r D New Meter Size/Type r/' Al A - rZ E. Type of work performed or findings 9. If mainline or deep service repair, describe type of pipe or service line and condition: 5 a- // 10. Man - hours: H� Crew Members. 11. List Materials Used: /MORE% 1 '- c likel 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: 67 or fail 14. How many trips to do task? Signature g. i /'/ y� 1 -6`,