Loading...
2001_0730 7 WATER Issued: / ° 7 �� Finished: 2 3 a Employee: Grid map: Name: / ,/� 02✓6 a 2 .e- A dress: S Y5 "4 „-- 4s<A._ Phone Number (HM) (WK): '3 (o q .7 Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: (,�4i ri t1L pi..,44 9 - .A•< -1, VL G Vn 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # • $ Reading 6 3 B. New Meter # ;.OILS l i Reading di" C. Old Meter Size/Type: ' crs /be ' New Meter Size/ E. Type of work performed or findings: 9. If� a o//r, a service air, describe type of pipe or ser ce line . and con 'on: _ / 1 1 / / rn oler C.r� .5P4 f ,c5 b P frsM 10. Man - hours: Crew Members. 3� 11. List Materials Used: 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail Y 14. How man trips to do task? " Signature