Loading...
SS9301-CS 931115KENKO CONTRACTOR S November 15, 1993 City of Coppell 255 Parkway Boulevard Coppell, TX 7§019 Attn: Mr. Garreth Campbell Re: Grapevine Creek Sewer Trunk Main - Branch I & II Coppell, TX Kenko Job #9306 * Lot 20R, Block F, Northlake Woodlands East Phase 6 Dear Sir: Kenko is in receipt of the fax regarding Mr. Donald Brewer's property. The undersigned has reviewed the letter with Kenko Project Superintendent, Jerry Haukos. Please note that the dirt has been replaced to pre-construction grades. According to Mr. Haukos, the sprinkler system was in direct conflict with the installation of the sewer main. As such, it is Kenko's position that the City should bear the cost of reinstalling the sprinkler system. Please call if you have any questions. .qincerely, D~anie~R~.' F~r/~~er Konko, Inc. SOUTHWESTERN DIVISION - 16415 Addison Rd., Ste. 308 - Dallas, TX 75248 - (214) 931-9494 - Fax (214) 931-5474 WESTERN DIVISION - Post Office Box 831 - Calimesa, California 92320 - (714) 795-2568 - Fax (714) 795-1840 CORPORATE OFFICE - 1694 91 st Avenue - Blaine, Minnesota 55449 - (612) 786-6510 - Fax (612) 786-6602