Loading...
ST8807-CS 890413OPPELL PUBLIC WORKS April 13, 1989 TO: FROM: RE: Steve Goram, Director of Public Works Steve Morton, Chief Public Works Inspector Royal Lane North (Tickler) Water, sewer and storm line have been installed and tested. The drainage ditch has been excavated and bank roughed in. The slopes of bank, elevation and grade will be verified by the Engineer. Two inspections daily will need to be made during my absence (April 10 to 14). SMM/sm