ST8807-CS 890413OPPELL PUBLIC WORKS
April 13, 1989
TO:
FROM:
RE:
Steve Goram, Director of Public Works
Steve Morton, Chief Public Works Inspector
Royal Lane North (Tickler)
Water, sewer and storm line have been installed and tested. The
drainage ditch has been excavated and bank roughed in. The slopes
of bank, elevation and grade will be verified by the Engineer.
Two inspections daily will need to be made during my absence (April
10 to 14).
SMM/sm