ST8807-CS 890315COPPELL PUBLIC WORKS
MEMORANDUM
March 15, 1989
TO:
FROM.:
RE:
Steve Goram, Director of Public Works
Steven M. Morton, Chief Public Works Inspector
North Royal Lane / Tickler 3/14/89
Steve, as of to date the sanitary sewer is constructed, but not
tested. The water is 20% constructed and I have received the Letter
of Agreement with property owner, Connell, and Cullam on his trees.
Box culvert @ Royal and Thweatt is 10% constructed.
SMM/bb