Loading...
ST8807-CS 890315COPPELL PUBLIC WORKS MEMORANDUM March 15, 1989 TO: FROM.: RE: Steve Goram, Director of Public Works Steven M. Morton, Chief Public Works Inspector North Royal Lane / Tickler 3/14/89 Steve, as of to date the sanitary sewer is constructed, but not tested. The water is 20% constructed and I have received the Letter of Agreement with property owner, Connell, and Cullam on his trees. Box culvert @ Royal and Thweatt is 10% constructed. SMM/bb