ST8807-CS 890209 (2)COPPELL PUBLIC WORKS NENORANDUN February 9, 1989 TO: FROM: RE: Alan Ratliff, City Manager Steve Goram, Director of Public Work South Royal Lane Construction Attached is Steven Morton's comnents to me in regards to a letter received from Barry Knight in reference to the above matter. Steven has provided inform~tion which I am forwarding to you for your information, which will help identify what has prompted Mr. Knight's letter. The procedures which Public Works Inspections followed are in accordance to subdivision ordinance regulations and staff believes within the terms of the contracts and/or other agreements that we are aware of. If you would like to discuss this. further, please advise. SGG/bh cc: Frank Trando, Deputy City Manager/Finance Director Attachment COPPELL PUBLIC gORKS MEMORANDUM February 9, 1989 TO: Steve Goram, Director of Public Works FROM: Steven M. Morton, Chief Public Works Inspector~'////~ RE: Royal Lane Project Steve, in regards to the letter I received from Winstead, McGuire, Sechrest, & Minick Attorney. In said letter Barry Knight states "there are no inspection fees due on this property since it was agreed early in the process that all city inspections would be waived because this in effect was a city project being paid for by my client". I am attaching the Four Letters of Agreement. The first agreement is for the waiver of fee and reimbursement for the channel from Freeport to Minyard - USPS property line. The second agreement is for the waiver of fees and reimbursement for the 16" D.I.P. water line. The third is resolution 081286.1, which urges the construction of Royal Lane. The forth is the Coppell - Thompson agreement which delineates responsibility. In addition, I have reread the "Project Manual for Construction of Royal Lane" prepared by DeShazo, Starek, & Tang Engineers again. I, to date, have not found any reference to the waiver of inspection fees associated with the paving and storm drainage for this project. Furthermore, the City had no 'reimbursable items in the paving and storm drainage construction. My assessment to Thompson for $17,470.79 is based on 1.5% of the contract amount for schedule #1 of $1,164,719.21 for the construction of street, storm drainage and sanitary sewer only and is based on data submitted by DeShazo, Starek, & 'Fang (attached). In response to the cleaning of the channel being the City's responsibility. This issue was brought up in discussion with Uvalde and Clyde on requirements for acceptance. Clyde wrote Wayne Ginn and copied Barry Knight on July 20, 1988 on this matter. Uvalde did have Hall Construction clean out the pilot channel in which I did inspect, but Hall did not complete their work. They neglected to clean the 6" of sediment from the 8-9' x 4' box culvert and the other three 8-8' x 5' box culverts along Bethel as originally requested. The City's maintenance starts after acceptance. The $3500.00 is a arbitrary derived from estimated time and equipment rental charges the City would be faced~ with to finish Uvaldes work and in the possibility USPS opted to not extend box culverts. In closing, on 12/15/88 representatives from the City of Coppell, DfW, and DeShazo, Starek, & Tang conducted the final walk thru inspection and issued a typed punch list to Uvalde for completion. Ail but the two mentioned items have been verified completed, as is our normal process for every project submitted for City acceptance. SI~/bb Attachment