Loading...
ST8807-CS 881115COPPELL PUBLIC WORKS HEMO~I~ November 15, 1988 TO: FROM: RE: Steve Goram, Director of Public Works Steven M~ Morton, Chief Developmental Inspector Royal Lane Status I have received the Texas Highway Department.'s intersection striping layout and have forwarded them Onto Clyde, so he can schedule Uvalde to complete the striping. I have also received a letter from Clyde (attached) outlining what they feel is their responsibility. In summary, Thompson has agreed to do .all the ~striping requested. 'As for the channel bank seeding. They have attached a copy of a phone log of a conversation with Wayne Ginn. They feel they are not responsible to do seeding and .they feel that Wayne, as the City representative, agreed that if they used 4:1 slope and installed a pilot channel, they would not be required to seed. ~ As of to date the outstanding items are: 1) Cleaning Culverts " 2) Street Striping 3) Erosion Protection (seeding) We will need to respond' to Clyde's letter as soon as possible to keep this project' tracking for November-December walk-thru. SMM/bb