Loading...
2002_0422 WATER Issued: _42402,___ Finished Employee: Grid Map: Name: Address: (,,3 4 L All F PA-12Z Phone Number (HM): (WK): Check For: Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Rank 3. Maintenance 4. Q Backflow Insp. A Main Line A. Pump - A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: f Ili FTr2 c no - c - • 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing _ Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # 91t3 /904 - Reading 39°4g B. New Meter i# 0fo / 4 0 F Reading . O C. Old Meter Size / Type New Meter Size / Type • MA3 R. E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident, incident while performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL How many trips to do task? ("�' 14. EIo m y p Signature