Loading...
2002_0423 WATER Issued: 4/73ioe_ Finished Employee: Grid Map: Name: Address: R:9 j.. Ai R. t )i L) C T Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Emit 3. Maintenance 4. Ot ei Backflow Insp. A Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: M t7C't Cam/ y e cTr 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # ® q/ 00 y 7 f Reading a 70yZ B. New Meter # , e/ / 2 Reading 0 C. Old Meter Size / Type €71._ New Meter Size / Type /»'445Tt71 E. Type of work performed or hndings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident; incident •. hile performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? v" " AVZ Signature