2002_0508 WATER
Issued: , s l � t) Z Finished 5/81v v Z Employee: Grid Map:
Name: Jj Address: 3 LPK
Phone Number (HM): (WK):
Check For: Accuracy Test Meter Leak Check Water Pressure
Initial Meter Relocation Inspections Re -Read
1. Backflow Insp. 2. $pair 3. Maintenance 4. Old
Backflow Insp. A. Main Line A. Pump A. Line Locate
Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate
Re -Cert. Date C. Service Line C. Samples C. Tap
D. Hydrants D. Equipment D. Excavation
E. Safety •• •
5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other
6, List of Safety Equipment at Site (if applicable):
A. Barricades B. Cones C. Tape D. Lights E. Other
REQUEST FOR SERVICES: C.C�, � e
7. If Meter / Service Leak, Classify: City Customer
A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons
B. Was Water Metered: YES NO
C. Was Customer Notified: VERBALLY DOORKNOCKER
8. If Meter Change Out:
A. Old Meter # g i 7 7 g Reading . J /q. L 1 2
B. New Meter # <= Reading
C. Old Meter Size / Type L. New Meter Size / Type —==
E. Type of work performed or findings:
9. If mainline or deep service repair, describe type of pipe or service line and condition:
10. Man hours: Crew members:
11. List materials used:
12. If you had an accident'incident while performing this request, did you report it? YES or NO
13. Water Utilities meter inspection: PASS or FAIL
14. How many trips to do task? C C 44
Signature