Loading...
2002_0507 WATER Issued: S (7 , b Z- Finished: 51 ) 0 2- Employee: Grid Map: Name: Address: 3) 3 )- Aket.0003 Phone Number (HM): (WK): Check For: Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Km& 3. Maintenance 4. Qty, et Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety •• • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: 64,0 e 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # 9 ni./ (P9 q Reading ) lofo Z17 B. New Meter # a 2ao Reading 0 C. Old Meter Size / Type ?Ro-c.lSink) New Meter Size / Type MAC• +FYL E. Type of work performed or findings: 9. it mainline or deep service re*„ a.r, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident, incident while performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task Signature