Loading...
ST8807-CS 871021UVAlde CONSTRUCTION COMPANY ENGIN£ERING CONSTRUCTION ' HIGHWAYS AND PAVEMENTS DALLAS,TEXAS 7.5207 214/631 -! 750 October 21, 1987 DeShazo, Starek, and Tang, Inc. 330 Union Station Dallas, Texas 75202 Attention: Mr. Paul Lipscomb RE: Royal Lane I.H. 635 to Bethel Rd. Dear Mr. Lipscomb: As requested, for the locating of valves on the existing 16" water line in Bethel Road and Freeport Parkway, we propose to perform the following added work for the considerations shown: For furnishing labor and equipment required to perform locations and temporary pavement repair required, to include fuel, oil, grease, payroll taxes, insurance, overhead and profit at $125.00 per hour for time on job. For materials required for locations and pavement repair, at cost of actual delivered material invoice, plus 15% for overhead and profit. 3. For barricades required to perform work as per attached rental list, paid at suppliers actual invoice, plus 15% for overhead and profit. The above quoted prices are based on locating utilities and temporary repair of paving, one time only, any additional repair required will be quoted at a later date or incorporated in the change order forthcoming for lowering the existing 16" R.C.P. water line. This additional work will not be a chargable day of work on our original contract, nor is retainage to be held on rental work. Should you have any questions regarding this additional work, please call at any time, or please issue a change order reflecting same at the earliest possible date. Yours very truly, MRB/mkl B8/94 UVALDE CONSTRUCTION COMPANY EQUIPMENT RENTAL RATES EFFECTIVE MAY 1, 1987 RATE PER HOUR EQUIPMENT DESCRIPTION WITH OPERATOR D-7 Tractor w/Scraper ............................................... $ 95.00 D-7 Tractor w/Dozer ................................................. 90.00 D-7 Tractor w/Sheepsfoot ............................................ 95.00 DD - Motorgrader .................................................... 50.00 #12 Cat Motorgrader ................................................. 70.00 920 Cat Loader ...................................................... 60.00 930 Cat Loader ...................................................... 65.00 922 Cat RT Loader .................................................... 45.00 950 Cat RT Loader ................................................... 80.00 966 Cat RT Loader ............................................. ~ ..... 85.00 977 Cat Trac Loader ................................................. 90.00 Self-Loading Scrpater (8 CY) ........................................ 90.00 12 CY Dump Truck .................................................... 37.00 Water Truck ......................................................... 50.00 10-12 Ton Pneumati= Roller .......................................... 45.00 Self-Prop Sheepsfoot Roller ......................................... 80.00 Asphalt Laydown Machine ............................................. 140.00 Tandem Roller ....................................................... 50.00 3-Wheel Roller ...................................................... 50.00 Vibrating Roller .................................................... 50.00 Distributor Truck ................................................... 55.00 Truck & Trailer ..................................................... 85.00 Backhoe ............................................................. 65.00 Backhoe 225 ......................................................... 125.00 Backhoe 235 ......................................................... 150.00 Hydra-Hammer ........................................................ 70.00 Bros Broom .......................................................... 55.00 Pulvimixer .......................................................... 100.00 Hydra-Lift Truck .................................................... 40.00 Spreader Box ........................................................ 70.00 Concrete Saw (does not include blades) .............................. 30.00 Curb Machine - Asphalt .............................................. 30.00 Gradall ............................................................. 100.00 Lime Slurry Pump .................................................... 20.00 Note: Rates include fuel, oil, grease, and operator. Based on actual working hours. Move-in: There will be a two hour move-in charge for each unit of equipment as needed. LEOTI~IO SAFETY LITES D&ily l~eutal l~tea Type I! barricade ~rit~ I lite Type IX barricade ouly ll ~. ~a~ors~ ouly Va~tic~ P~el ~th I lite Vertical P~el only ~e III PaneX 12 Ft. T~e III PaneX $ F~. Li~es: ~e A T~e C Si~ns: S~ll Medi~ .40 .30 .40 .30 .50 .40 .50 The new minimum charge for ~ac~ location is $40.00." The~e ~ill be a delivery charge of $20.00 for locations outside the metroplex area and also if we are required to make deliveries to your Jobstte two or more times on the same day.