Loading...
2002_0402 � l 1 WATER !' Issued: 7 7 aZ Finished: / 9/k Z Employee: Grid map: Name: Address: H l W /1&A: JJ) N( O(..) Phone Number: (HM) (WK): Check for: Accuracy test Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Reg& 3. Maintenance 4. Q Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re - Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: JYl L'7`E72._ !v e c .rr 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # C Z Reading 4 ( O B. New Meter # • ' Reading C 7CicxD C. Old Meter SizeiType: D New Meter SizelType `:= E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man - hours: Crew Members. 11. List Materials Used: 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? �� Signature fli� O/