Loading...
2002_0403 WATER Issued: 41.3��Z Finished: 4/3i://,_ Employee: Grid map: Name: / Address: / 7-2. /1/614:40) ,C400 l Phone Number: (HM) (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Beak 3. Maintenance 4. Kiln Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety , 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: e . C 1v4.�.' -. C-ti l7 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes • No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # .33 015 7 Reading /'.rim/ 7'r B. New Meter # as/a-933 Reading 2012 C. Old Meter Size/ Type: S y /44 'p D New Meter Size/Type S'TE -fit E. Type of work performed oPfmdings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature e44:;;:L ea.�..