Loading...
ST9605-LR 980514 F~EE:E~i EI~E~ II--IEEI~IIr-II:~ GEOTECHN~EAL AND r~ F~ I~1 II p ENVIRONMENTAL CONSULtaNTS REPORT OF FIELD GRADATION TEST Northpointe Drive Highway 121 to Northpointe Drive Coppell, Texas REPORTED TO: Emerson Partners, Inc REPORT NO. 10 10005 Technology Boulevard, West REPORT DATE: 05-14-98 Suite 151 REG PROJECT NO. 4043 Dallas, Texas 75220 TECHNICIAN: S. Hope ATTN: Mr. Jim McEIroy PAGE: 1 of 1 CONTRACTOR: North Texas Contracting, Inc. 100 04-23-98 STA. 0+40 100 85.2 STA. 2+70 100 90.2 STA. 5+00 100 91.3 Comment: Where tested, materials were in compliance with project specifications. Distribution: (1) Emerson Partners, Inc./ Submitted by: Mr. Jim McEIroy (1) Rust, Inc./Mr. Andre P. Taylor REED ENGINEERING GROUP, INC. (1) North Texas Contracting, Inc. Mr. Robert Farrow Original Signed By (1) City of Coppell/Mr. Larry Davis Ronald F. Reed, P.E. KA/rls 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019