Loading...
ST9605-LR 980506 GEOTECHNICAL AND ENVIR. ONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Northpointe Drive Highway 121 to Northpointe Drive Coppell, Texas REPORTED TO: Emerson Partners, Inc REPORT NO. 14 10005 Technology Boulevard, West REG PROJECT NO. 4043 Suite 151 SAMPLE DATE: 05-06-98 Dallas, Texas 75220 TECHNICIAN: K. Graham ATTN: Mr. Jim McEIroy CONTRACTOR: North Texas Contracting, Inc. Location of Sample 1 Paving at STA. 2+75 on North Pointe Dr. 90/300 2 Paving at STA. 2+25 on North Pointe Dr. 120/300 3 Paving at STA. 0+50 on North Pointe Dr. 250/300 Design Information ................... ........................ ..... .............................................................. 4'60C .................... 2 Lattimore 42 4000 3 Latt more 42 4000 Test Results 1 1236 05-13-98 7 100360 3550 1236 06-03-98 28 122610 4340 1236 06-03-98 28 121240 4290 4320 2 1237 05-13-98 7 101780 3600 1237 06-03-98 28 124990 4420 1237 06-03-98 28 124770 4420 4420 3 1238 05-13-98 7 87460 3090 1238 06-03-98 28 113860 4030 1238 06-03-98 28 112630 3990 4010 Cylinder Data 1 1236 4.50 68 75 4.2 7:40 AM 7050668 2 1237 5.00 70 78 4.5 8:05 AM 7050672 3 1238 5.00 76 82 4.0 10:00 AM 7050690 2424 STUTZDR. · SUITE400 · DALLAS, TX75235 · TEL [2J41350 5600 · FAX[214]3500019 Distribution: (1) Emerson Partners, Inc./ Submitted by: Mr. Jim McEIroy (1) Rust, Inc./Mr. Andre P. Taylor REED ENGINEERING GROUP, INC. (1) North Texas Contracting, Inc. Mr. Robert Farrow Original Signed By (1) City of Coppell/Mr. Larry Davis Keith E. Atkins KEA/cdl