Loading...
WA9903-CS000526 (2)SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT H/CKEY, P.E. ROSS L. JACOBS, P.E. I. C. FINKLEA, P.E. JOHN R. BAUMGARTNER, P.E. May 26, 2000 Advantage C tract Services, Inc. 7150 A1 a Genoa Rd. ,5 Repainting of the 1.5 Million Gallon Elevated Storage Tank Gentlemen: On March 3, 2000, the City of Coppell issued a notice to proceed for the work required to repaint the interior bowl of the 1.5 Million Gallon Elevated Storage Tank. That notice established a contract completion date of May 2, 2000 for placing the tank back in service. In accordance with Addendum Number 3, dated January 26, 2000, all items of work on the tank were to be completed by no later than June 2, 2000. This date was adjusted seven (7) calendar days by the notice to proceed. This letter serves to verify that your completion date for all items of work on this project is now June 9, 2000. As the City reports no construction activity at the tank for some time, you are hereby directed to provide adequate labor, equipment and materials to complete all items of work within the allotted contract time. This includes adequate time for the City to conduct a final inspection and your completion of any reasonable punch list the City or we may develop. Please indicate your receipt of this directive and respond with your revised schedule and anticipated date for final inspection and walk-through of this project. If you need any clarification or additional direction, please do not hesitate to contact this office. cc: Mr. Glenn D. Hollowell, P.E. VM~.Larry Davis j:XcledcalXcoppell\1999-176\letlersXconstXk\completion of project. doe