ST9605-LR 980311 GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT OF FIELD DENSITY TESTS
Northpointe Drive
Highway 121 to Northpointe Drive
Coppell, Texas
REPORTED TO: Emerson Partners, Inc REPORT NO. 6
10005 Technology Boulevard, West REPORT DATE: 03-11-98
Suite 151 REG PROJECT NO. 4043
Dallas, Texas 75220 TECHNICIAN: S. Hope
ATTN: Mr. Jim McEIroy PAGE: 1 of 1
CONTRACTOR: North Texas Contracting, Inc.
& trace limestone particles 102 0 I
2 D-698 Dark brown clay 21.0 .
73 02-11-98 Storm Line: STA 0+25 0.8 94.5 23.8 1 97.9
74 Storm Line: STA 0+50 0.0 94.8 23.3 1 98.2
75 Storm Line: STA 1+50 0.8 93.9 24.3 1 97.3
76 Storm Line: STA 2+00 0.0 93.8 22.9 1 97.2
77 Storm Line: STA 2+46 0.0 94.0 23.2 1 97.4
Comments: Where tested, materials were in compliance with project specifications.
Distribution: (1) Emerson Partners, Inc./ Submitted by:
Mr. Jim McEIroy
(1) Rust, Inc./Mr. Andre P. Taylor REED ENGINEERING GROUP, INC.
(1) North Texas Contracting, Inc.
Mr. Robert Farrow Original Signed By
(1) City of Coppell/Mr. Larry Davis
Ronald F. Reed, P.E.
RFR/rls
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019