Loading...
Lesley Retail (QT)-PT111019 T H E • C I T Y •O F COPPELL r, S 1 d EARLY GRADING / EXCAVATION PERMIT IN RIGHT -OF -WAY / EASEMENT / PRIVATE PROPERTY Date: /d- /1- /( E( Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) © Tree Removal Permit from Parks & Recreation Dept. required. [r Hold Harmless Letter from the Property Owner /Engineer /Developer is attached. Project Name /Location: _4f /‘/ / 1(Y'( B ' // 1,'c goe. General Contractor: XE G(1PP C ONS T2 k Crt o n( l _ j Permit issued to Company /Representative: jD /), .//c,7 Address: // W /4. 1";41(4-b , %i 44 ss / 7 'l G d ? Telephone #: f77 Ty 7 Emergency Telephone #: Fl 7- Pfy - S General Description of work (provide copy of approved plans): ➢ Was contact made with City and /or Utility Companies to locate existing utilities? if NO, Reason: [✓(YES ❑ NO ➢ Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit? if NO, Reason: d ee, or. 544.. E /YES ❑ NO ➢ Is removal of existing street, alleys, or sidewalks necessary? ❑ YES MO if YES, Attach Bore /Street Cut /Saw Cut Permit ➢ Is Floodplain Permit required? ❑ YES NO if YES, Permit # or date of City Council variance Early Grading / Excavation Permit Page 2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). ➢ Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3500 Street Department @ 972 - 462 -5150 Engineering Department @ 972 - 304 -3679 ➢ Attach barricade plan / trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m. until 4:00 p.m. ONLY unless otherwise approved by City Engineer. ➢ A 2% inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) Amount Paid $ y, (O 'ff . d L Date Paid / Z / (7 l 1 • City inspector must be notified 24 hours prior to beginning work related to this permit. Si a ture of Applic t /Contractor Rep. Printedame Date 014 (1l(O 7--L 84 Coft`11/1 Signatur o y Engineer Printed Name Date City Inspector for this project Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. 2497 11 DALLAS DIVISION - 1 II REAL ESTATE SPECIAL 1120 NORTH INDUSTRIAL BOULEVARD (c).....f 32-61 --- EULESS TEXAS 76039 DATE i 2/ I ORDER OF _ r ) (77' -- y A tillt/L 1--4/4 , _____ tik__ i ='' .„ 1M 1 CHASE ej L. 6 :0 4 .1._.it FOR_ _ 4i: 44-- , ivp ' CASH 082516 , RECEIPT , , m - ww ----- ` , °=" o�* ` � , — �� =E^ M(11 ,' 011 r CP | | . _ 13(17/20:1 1e: 95 131741(.0,77 R. CONSTR L '," ;';‘,(4.-_ 1.91,' 62 REVISED PROPOSAL ER. R.E. CUPP CONSTRUCTION, L.P. ! 1320 PC White °lair-1111yd. SoothInke, Ix 76092 I 1 1. PP Contact: Mayne Cupp .-n(11ll Cfl11" b 11 W P 0e: 817410-6445 ON tiunlr . Fax: 817-464677 A minim.: Scott Oves 4.0.1.sr.491P: Quilarip 0969 Calien To; Harman Construction i4,Catian: Dividend I)r. & Srirth lit* I roe 1M Adth$s: 1633 Room Read C.i & State: Coppell. TeaN City a. St fort Worth 'es Option! 12" Lime. Stabilization @Paving Eb_me,;., 1117-346 5760 LIS 817-330797 Bairn Cole.. 1313Q7969 Dav 10 11 We propose to furnish labor, materials & equipment ou the above refercnced Inject. ITEM .PESCRAITION QUANTITY UNIT UNIT PRICE Alv1OUNT WDItK in win A WIF: (Price in crowd for 30 dAys) (Job r, to be erforned in one move-in). . , r 5 Emght..'eri0WS‘tating For R.E. Cupp's Scope 0113 , 1.00 LS 5.000.00 5,000.0) 10 Dust Como] 1.00 LS 2,50100 a.5130.00 15 Demo & Remover Existing Concrete 1,22).00 SF 2.17 2,647 45 20 Stripelan6 te! utilize- Strippings In LandscarP Area; 1,431 00 c'( 3 70 f,294.70 25 Ca & Filt Site ; 1,223.00 CY 1157 14I 15,40 30 Scarify .14:: Cataract S'' Suiding Put Subgraas 7,93.00 $F 0I3 ,413.77 35 Import 8a Ploco 7.58' Sottxt nil @ Pact 3.360.00 TCY 13.74 4C166.40 40 Providc a Maur. Cillniutlit Fill Tu Achizvz Sitlignide 9,4300) TCY 7.13 07,307,20 , 45 Scarily it Ctrapaut r nving Subgrade 72,242.0) 3, 0.10 7,224_20 !.. Lime $tabilizo QT Pasting12 " 6% Ws t'2 6" Lifts) a, 027.07 SY 3.86 30,9842.1 . --, 55 Lioae Material j 217.05 FON 161.94 35,140.9R _ 69 Coastmotion EnTarse 1 1.03 EA. 7 ` 000 00 ..„ 2,000.00 6i Install Silt Fence 0a1y 1 010 03 LF 2.00 ';.,020.00 70 Bac:d11 (o:41$ Utilizing Oasit..;: Mat..nal 1 0) LS 8.:„'86.90 t,386.90 Onikirlo 069 Site Total: $232„201.17 ALTERNATES: ADD/DEDUCT _ Nat_SL, EXCLUEONS: ALL GRAMM & SUB GRADE PREPERA TIO1 OF OFFSITE DRAB, ASBESTOS SURVEY & ABATEWENT, EXPORT POST BOWLED MATERIALS .FROM .U11.L1N OR PAVING AREAS, `..K..PORT OF OTBER. SIBCOITCRACTORS SPOILS, SIDEWALK EXCAVATION, LOCATION CF u EROSION corm% °ITER Page 1 of 2