Loading...
SS9301-CS 930730 " - - ........... JUL 1993 '~.' / ... - .... .-- :J f'.. ~. ~o~ ~ " .... - :- - · Coppe!: Texas 75.g~9 · ~:.. ..-__~ The C,ty '-,%'-tn A Beaubfu~ Future 214-462-0022 · .." ; · ;-~'--'"1 -':~;! - ' ::': '-- '~' REQUEST ~ /- · INFORMAIION FORM (Type or Print Legibly) DATE OF, REQUEST:-.5 ,,x..,.,% 3C,, NAME: l,~!c ~,x & ~c: ~-,,~ ~-~'~ COMPANY NAME: HOMEADDR~S: 3~q ~J{ COMPANY ADD, S: HOME PHONE ~: .~f ~ '- ~ ~2 ~. COMPANY PHONE ~ch item of information r~uest~ is to be submitt~ on a sep~ate "I~O~ATION REQU~T FO~M." We shall endeavor to have all infomation available for you by the ~te ~ou have requited; however, thN N not alu'ays po~ible and in some cas~ your info~ation requ~ed may be delayed. There is a charge of .25 for the first copy and . 15 for ~ch addition~ page of matefi~ r~uest~. INFORMATION REQUITED: ~ O~ % ,'~..'c_ ~ ~.% , ~ C- tl O- , *-~ O. ~ ~ .~' 0~~ ~ : / ~ ~ ' ) ' ' c~. (Si~.at.r~ of ~rso. ti~ om r~u~st fora) DATE MATERIAL RECEIVED: Number of Copies: Amount: $ Receipt Number: Employee Check [ ] Cash [ ] A :\FO RM'd~.EQUEST. FOR Clef OF COPPELL ODST (I]MPARISON - GRAPEVINE ~ SE~ER TRb~K MAIN - BRAN~{ I OPTION A - PRO3MCr AS D~I(~tD - CREEK BOI%ON M/tIE - (NO BOTION STABILIZATION - NO EROSION CONTROL) 100% O~TION ON FA,,qS~ .%OQUi$ITION - 58/1 : 58 TotAL. 50% O~TION ON E~ AO~ISmoN - 58/2 : 29 OPTION C - ALI~TE ROJTE - E. B~ ROAD - (N. b~NE OF STREET) - OP~/CLT ORIGL-NAL oFrION OPTION OPTION I)~CRIFFION ESTLMATE A B C OPIN-fON OF PROBABLE ESTIMATED 0ONSTRUCrION (DMTS TRA MANHO~IRD $460,000.00 $460,000.00 $460,000.00 M(X3qNGBIRD/FAST BANK 702,0C-9.00 702,000.00 702,000.00 FAST BANK TO D~NR)N T.%P 612,000.00 612,000.00 1,356,000.00 BO]VflM STABILIZATION 0.00 600,000.00 0.00 SL~IUFAL FATIMATED O~NSTRULTION fDSTS $1,250,000.00 $1,774,000.00 $2,374,000.00 $2,518,000.00 DESIGN PHASE S]~VICES SL.~VE%/NG $43,500.00 $46,500.00 $51,000.00 $51,000.00 G]IYltEHNI~ 20,000.00 14,600.00 16,600.00 16,200.00 D~G~ DESIGN 78,625.00 105,600.00 137,200.00 143,400.00 goMIOTAL DESIGN PHASE SER~TCES $142,125.00 $166,700.00 $204,800.00 $210,600.00 OONSTRULTION M{ASE (DN~ON ADMINISTRATION $13,875.00 $18,600.00 $24,200.00 $25,300.00 /NSPECTION 37,500.00 88,700.00 118,700.00 125,900.00 TESTING 15,300.00 53,200.00 71,200.00 75,600.00 Sb~qUFAL. (I~~ON PHASE. $66,675.00 $160,500.00 $214,100.00 $226,800.00 IUrAL - DESIGN AND (/INSTRUCTION $1,458,800.00 $2,101,200.00 $2,792,900.00 $2,955,400.00 ~IES (10% OPTIONS A-C) $259,200.00 $210,120.00 $279,290.00 $295,540.00 It)TAL. (I]N~ON (I]STS $1,718,000.00 $2,311,320.00 $3,072,190.00 $3,250,940.00 EASfMMW/RIGh'r-OF-~Y $32,000.00 NM~OI~IO~' $ FEE $87,000.00 $43,500.00 $1,500.00 ATIDRNEY' S F~M 145,000.00 72,500.00 2,500.00 O~[ISSION]~' S CO[~T 87,000.00 43,500.00 1,500.00 AWARDS/DAMAGES 290,000.00 145,000.00 5,000.00 I_OTS 8/9, NLWE 12 20,000.00 20,000.00 20,000.00 SUB'IUFAL .%SSOCIAT~D fDSTS $3~.000.~.~0 $629,000.00 $324,500.00 $30,500.00 TOTAL PMDoq~LT (DSTS $1,750,000.00 $2,940,320.00 $3,396,690.00 $3,281,440.{Y~ GRAPEVINE CREEK SEWER TRUNK ~!N ASSUMPTIONS MADE IN COST ESTi~%TES Original Estimate 1) The sanitary sewer would be placed on the north side of Grapevine Creek in or near the existing easement. 2) Any easements needed would be dedicated to the City. 3) The Engineering Design fee would be 7.5% of the construction cost. (This fee is based on a sliding curve based on the construction cost). 4} The inspection cost would be 3% of the construction cost. Option A 1) The Engineering Design fee would be 7% of the construction cost. 2) The Inspection cost would be 3% of the construction cost. 3) There would be 100% condemnation of the lots in the Creekview and Meadowcreek subdivisions (58 total). 4) The negotiator/appraisal fee would be $1,500 per condemnation. 5) The attorney's fee wou~d be $2,500 per condemnation. 6) The commissioner's court cost would be $1,500 per condemnation. 7) The Awards/Damages wou%d be $5,000 per condemnation. Option B 1) The Engineering Design fee would be 6.8% of the construction cost. 2) The inspection cost would be 3% of the construction cost. 3) There would be 50% condemnation of the lots in the Creekview and Meadowcreek subdivision (29 total). 4) The negotiator/appraisal fee would be $1,500 per condemnation. 5) The attorney's fee would be $2,500 per condemnation. 6) The commissioner's court cost would be $1,500 per condemnation. 7) The Awards/DamaGes would be $5,000 per condemnation. 8) The bottom stabilization would be a solid gabion mat from toe to toe of the creek. Option C 1) The Engineering Design fee would be 6.7% of the construction cost. 2) The inspection cost would be 3% of the construction cost. 3) About 2,330 foot of Bethel could be open cut and the last 1,255 foot would be micro tunneled. 4) An additional box culvert would be added across Bethel Road to compensate for lost of capacity when the sewer line goes through the existing box culvert. GRAPASSU