Loading...
SS9301-CS 930728KENKO C 0 NTR ACTOR S Duly 28, 1993 Ginn & Case, Inc. 17103 Preston Road Suite 205, LB 118 Dallas, TX 75248 Attn: Mr. Wayne Ginn, P.E. Re: Grapevine Creek Sewer Trunk Main - Branch I & II Coppell, TX Kenko Job #9306 * Branch II Scheduling Dear Sir: Kenko is in receipt of your letter dated July 22, 1993. You state that proceeding with Branch II construction would severely limit your ability to solve any problems in the micro-tunnelling portion of the work. It should be noted that the flow elevations for Branch II remain consistent with the original "open-cut" design for Branch I. With this in mind, Kenko cannot imagine any problems in Branch I which would necessitate raising the flowline elevations in Branch II. It should be noted that as of today Kenko will complete installation of the 30" sewer to approximately Station 83+00. In the next week Kenko will drop back to pull mandrels, air test and make connections. Due to the current status of the micro- tunnelling, Kenko will be limited to the section of sewer downstream of Station 34+00. If the Owner's and Engineer's final decision is disallow construction of Branch II at this time, Kenko upon completing the above mentioned work will move off the project. Kenko will return once the remaining work is released for construction and weather conditions are favorable. Please call if you have any questions. Sincerely, Kenko, Inc. cc: Ken Griffin, City of Coppell SOUTHWESTERN DIVISION - ! 6415 Addison Rd., Ste. 308 - Dallas, TX 75248 - (2 ! 4) 931-9494 - Fax (2 ! 4) 93 !-5474 WESTERN DIVISION - Post O[fice Box 83 ! - Calimesa, California 92320 - (714) 795-2568 o Fax (7 ! 4) 795-1840 CORPORATE OFFICE - i 694 91 st Avenue - Blaine, Minnesota 55449 - (612) 786-6510 - Fax (6 ! 2) 786-6602