ST8807-CS 870505May 5, 1987 Mr. Wayne Ginn, P.E. Ginn, Inc. Consulting Engineers 17103 Preston Road, Suite 100 Dallas, Texas 75248 Re: Royal Lane, I.H. 635 to Bethel Road 16" Water Line in Royal Lane and Offsite Channel Improvements Adjacent to Bethel Road across Minyard's Property J86344.11 Dear Mr. Ginn: Attached are current cost estimates for the City of Coppell's participation in the area improvements: 1. 16" Water Line in Royal Lane w/5% Contingency $156,326 2. Offsite earth swale along Minyard's site with pilot channel and storm sewer improvements at Freeport Option A: With temporary culvert for Minyard's Access to Bethel-10% Contingency $205,225 Option B: With permanent bridge for Minyard's access to Bethel-10% Contingency $258,272 The above estimates are based on current prices and assume that the above work will be bid with the paving and drainage of Royal Lane. The cost of construction would be paid for by the City of Coppell. Please note that if a temporary culvert is built at Minyard's entrance to Bethel Road, this facility will either have to be enlarged in the future to accommodate the hundred year flood (full development) or be removed for a bridge structure. The cost to enlarge this temporary culvert in the future would exceed $100,000 and take additional right of way. Mr. Wayne Ginn, P.E. May 5, 1987 Page 2 Dir We have enclosed a conceptual Q50 Present Condition design for the earth channel along Bethel Road parallel to Minyard's property. We reco~end a full channel design to eliminate tailwater effects to the Postal site. Our conceptual channel design will also acco~odate a hundred year full development facility by changing side slopes, widening the bottom and full concrete lining within the easement shown on our drawing. Please call if we can answer any questions. ~ctor, Civil': ineering CLS/np cc: David Dean Bill Thompson Paul Lipscomb CONSTRUCTION COST ESTIMATES Royal Lane I.H. 635 to Bethel Road 16" Water Line J86344 Date: 4/30/87 Item No. Description 1 2 3 4 5 6 7 8 9 10 11 12 Unit 16" DI L.F 6" DI L.F. Fire ~ydrants & Valve Each Fittings Ton Boring Under RR Track & Road L.F. Crushed Stone C.Y. Sand C.Y. 16"Vert.Valve w/5'Dia. Manhole Each Conc. Encase L.F. 12" DI L.F. 12" Gate Valve Each 16"x16" Tapping Sleeve Each Subtotal + 5% Contingency TOTAL Unit Price $24 $14 $1,800 $1,800 $150 $25 $12 $7,000 $65 $16 $500 $2,200 Quantity 2,989 387 9 2.50 130 165 320 2 95 _43 1 1 Amount $71,736 $5,418 $16,200 $4,500 $19,500 $4,125 $3,840 $14,000 $6,175 $688 $500 $2,200 $148,882 $7,444 $156,326 CONSTRUCTION COST ESTIMATES OFFSITE CHANNEL ON MINYARD'S PROPERTY-CULVERT J86344 Unit Description Unit Price Unclass. Channel Excavation* C.Y. Reinforced Conc. Pilot ChannelS.F. Remove Existing RC Pipe L.S. Remove Existing Pipe Headwall Each Remove Ex. Conc. Pavement S.Y. Sawed Breakout Groove L.F. 8" 3000 psi R.C. Pavement S.Y. 6" 3000 psi Integral Curb L.F. 60" RC Pipe L.F. R.C. Pipe Headwall C.Y. Lower 16" Water Line L.S. Asphalt 6" Type D Ton Street Header . L.F. Unclass. Street Excavation C.Y. Sprinkler Heads Replaced L.S. Quantity SubTotal Access to Minyard-Culvert LoSo $2 11,300 $3.25 29,500 $2,500 1 $1,500 1 $10 35 $1.60 105 $13 35 $1.50 20 $70 125 $450 10 $3,000 1 $35 36 $10 38 $10 40 $3,500 i SubTotal + 10% Contingency Total** $41,300 I DATE: 5/1/87 Amount $22,600 $95,875 $2,500 $1,500 $350 $168 $455 $3O $8,750 $4,500 $3,000 $1,260 $380 $400 $3,500 $145,268 $41,300 $186,568 $18,657 $205,225 * Assumes nearby disposal site. ** No replacement of landscaping. Easement dedicated. CONSTRUCTION COST ESTIMATES MINYARD ACCESS - CULVERT J86344 Description Unit Unit Price Quantity REMOVE EX. DRIVEWAY Remove Ex. Headwall & Pipes Remove Ex. Pavement Remove & Reset Barricade SubTotal LoS. L.S. L.S. $2,500 $3,100 $2,300 DATE: 5/1/87 Amount $2,500 $3,100 $2,300 $7,900 CONSTRUCT CULVERT Multi Box Culvert 3-8'x5' Culvert Headwall · Pipe Handrail Replace Pavement SubTotal CoXo C.Y. L.F. L.S. $250 $450 $25 $5,000 64 22 100 1 $16,000 $9,900 ._$2,500 '. $5,000 $33,400 $41,300 CONSTRUCTION COST ESTIMATES OFFSITE CHANNEL ON MINYARD'S PROPERTY-BRIDGE J86344 Description Unit Unit Price Unclass. Channel Excavation* C.Y. Reinforced Conc. Pilot ChannelS.F. Remove Existing RC Pipe L.S. Remove Existing Pipe Headwall Each Remove Ex. Conc. Pavement S.Y. Sawed Breakout Groove L.F. 8" 3000 psi R.C. Pavement S.Y. 6" 3000 psi Integral Curb L.F. 60" RC Pipe L.F. R.C. Pipe Headwall C.Y. Lower 16" Water Line L.S. Asphalt 6" Type D Ton Street Header L.F. Unclass. Street Excavation C.Y. Sprinkler Heads Replaced L.S. Quantity SubTotal Access to Minyard-Bridge noso $2 11,300 $3.25 29,500 $2,500 1 $1,500 1 $10 35 $1.60 105 $13 35 $1.50 20 $70 125 $450 10 $3,000 1 $35 36 $10'- 38 $10 40 $3,500 SubTotal + 10% Contingency Total** $89,525 I DATE: 5/1/87 Amount $22,600 $95,875 $2,500 $1,500 $350 $168 $455 $30 .$8,750 $4,500 $3,000 $1,260 $380 $400 S3;500 $145,268 $89,525 $234,793 $23,479 $258,272 * Assumes nearby disposal site. ** No replacement of landscaping. Easement dedicated. CONSTRUCTION COST ESTIMATES NYARD ACCESS - BRIDGE J86344 Description Unit Unit Price Quantity DATE: 5/1/87 Amount REMOVE EX. DRIVEWAY Remove Ex. Headwall & Pipes Remove Ex. Pavement Remove & Reset Barricade SubTotal L.S. L.S. $2,500 $3,100 $2,300 1 1 1 $2,500 $3,100 $2,300 $7,900 CONSTRUCT BRIDGE 35' X 65' Bridge Replace Pavement SubTotal SoFo $35 $2,000 2275 1 $79,625 $2,000 $81,625 $89,525