Loading...
ST8807-CS 870130GINN, INC. CONSULTING ENGINEERS TO- FROM: DATE'. SUBJECT: City of Coppell Attn: Shohre Daneshmand, Civil Engineer Attn: Taryon Bowman, Senior Planning Technician Ginn, Inc. January 30, 1987 Royal Lane Paving Improvements In the short time frame available to us, we made a cursory review of the above referenced subject for general conformance to the City of Coppell Subdivision Ordinance, Zoning Ordinance, and applicable standards. The following sets forth our comments. 1. Prior to acceptance by City of Coppell for maintenance, etc., a right-of-way dedication is required for the proposed paving improvements. 2. General notes, 913, delete Ginn, Inc. as being called upon for inspection. Contact Mr. Steve Morton, City Inspector. Note 915, batch plants and construction storage need S.U.P. for City of Coppell compliance. 3. Provide right-of-way map with names of all adjoining landowners. e 5. 6. 7. Provide lighting plan. Provide streetscape plan. Have plans stamped by registered engineer. Verify coordination with railroad and petroleum pipeline companies. In the past, requests for railroad crossings have had to come from City, not individual landowner. 8. When will future widening take place and who will be responsible for construction and costs at that time? 9. Provide written approval from railroad regarding ~- right-of-way, slope easements, etc. 10. How set are future driveway locations? What kind of provisions are made for crossovers, median openings, etc., whenever a drive is constructed? 11. Subdivision Ordinance states right-of-way to be 130' in width within 300 feet of intersection. This shall be required at Bethel School Road/Royal Lane intersection. What is shown on plans does not indicate that at this point in time. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 12. Design of Royal Lane south of Bethel School should reflect the proposed widening of Bethel School Road. 13. Using TP-40, City standards requires system to be designed using 100-year storm frequency. 14. Subdivision Ordinance states no open channels are allowed; such as Channel "B" or temporary Channel "A". How temporary is Channel "A." If Channel "B" is designed to carry 1200 cfs, what will happen when this flow reaches Freeport? Appears no provisions are made at this time. 15. If open channel should be allowed, 4:1 side slopes are required and concrete pilot channel also. 16. No landscape plan for median or proposed channel has been shown. 17. Indicate easements for channels. 18. Who is responsible for "future improvements downstream" as stated on the plans? 19. What type of erosion protection will be provided along slopes in and around railroad tracks area? 20. What type protection provided at channels and end of box culverts? 21. Water surface elevations in channel at end of box culverts do not agree from culvert sections to ditch profiles. 22. Will culverts have handrails or metal beam guard fence for safety? 23. Show profile of ditch (swale) on west side of proposed Royal Lane. Show typical section with slope indication. 24. Where future driveways cross over Channel "B" what will be requirements? 25. Is 2500 psi concrete for ditch improvements adequate? 26. Channel "A" does not take into consideration the widening of Bethel School Road in the future. Channel "A" also shows a 0% grade on the flowline of the channel. How will this provide positive drainage? 27. What is the capacity of the portion of Channel "A" from Station 11+91 to 2+90? 28. Water line from Cotton Road to Bethel School Road shall be 16" not 12" as proposed. Provide water service to medians for irrigation. · sMIeaapTs a~DTpuI '~£ 'I~Ao~ddw 'P~aOII~ s! p~oM Iooqos I~q~S ~o 6u!~no u~do ON 'gE 6p~p!Ao~d ~a~s X~!u~s ~a~q~ si 'IE 'osI~ au~ I~XOM ~o ~p!s ~s~a uo p~p!Ao~d ~q ~sn~ uo!~oa~o~d a=!M '0£ · uoi~zii~uBis pu~ 5uT~q$II ]o~ ~Inpuoo apIAOl~