Loading...
ST8807-CS 860109~r~ACREY, ROBERTS & PIERSON, INC. CONSULTING ENGINEERS 12160 Abrams Road · Suite 408 · Dallas, Texas 75243 · (214) 699-7916 Robert E. Acrey, P.E. Pres/dent Buddy J. Roberts, P.E. Vice President David E. Pierson, P.E. Vice President January 9, 1986 GINN, INC. 16135 Preston Road Suite 106 Dallas, Texas 75248 ATTN: Gabe Favre RE: Royal Lane Extension Coppell, Texas Job No. 84-11P-307 Dear Hr. Favre: This letter is in response to your reveiw letter dated January 6, 1986 of our engineering plans for Royal Lane Extension. The following addresses each of your items: 1. We added traffic lane buttons for the entire length of the proposed street. 2. Per City of Dallas design guildeline, the minimum grade for P.V.C. pipe is 0.26% to maintain 2.0 f.p.s, velocity. P.V.C. pil~ is specified on the plans and our slope is greater than 0.26%. 3. The street scape plans will be included with the civil set. We propose that the pedestrian crosswalk with concrete pavers be constructed in the future and that money for its construction be set aside in escrow. The reason ~or requesting this is the temporary nature of this intersection. Royal Lane will be concrete pavement with curb and gutter while Thweatt Road is asphalt with drainage ditches. When the property adjacent to Royal Lane and Thweatt is developed would be a more logical time to construct the crosswalk due to the potential grade changes when Thweat is developed. Another reason for not constructing the crosswalk at this time is that the curb stops at the beginning of the curb return radius which is in the middle of the crosswalk. 4. We added general note about city standards. 5. The ditch paralleling Thweatt road east of Royal Lane is temporary. When Connell developes his property and Thweatt is improved is when it will be enclosed. CIVIL AND ENVIRONMENTAL ENGINEERING -- Urban Planning. Subdivisions. Thoroughlare Paving, Streets. Drainage. Water Supply, Sewage Treatment. Dams and Reservoirs. Soils Reporls Gabe Pavre January 9, 1986 Page 2 6. We added details for backfilling and bedding. 7. We reduced the £ire hydrant spacing to 300 £eet. 8. We put engineers seal on each sheet. 9. We coordinated the street lighting plan with Texas Power ~ Light and showed light pole locations on the paving plan. 10. We added standard headwal! details but request that the decorative facing be left off at this time due to the temporary nature of the headwalls. this answers your questions or i£ you have any further questions, please give me a call. Sincerely, John W. Hawthorne, P.E. JWH: mmb cc: Ed Powell, City of Coppell/'/ / ?