Loading...
SS9301-CS 930713 Coppell, Texas 75019 ,~..~ ~. 214-462-0022 The City With A Beautiful Fulure ~'~ 5 ~'~""O1 July 13, 1993 Mr. Wayne Ginn Ginn, Inc. 17103 Preston Road Suite 205 Dallas, TX 75248 RE: Request for Point of Entry to Trinity River Authority/Grapevine Sanitary Sewer Line Phase I Dear Mr. Ginn: Per our conversation yesterday afternoon, I informed you that I had received a call from Bob Roth with Trinity River Authority. Bob had requested that the City submit a point of entry request for the new 30" tie-in to the 33" TRA interceptor. In speaking with Ken Griffin, he has asked that your office complete this packet and return to his office for his signature. If you. have any questions r~r~gar~ling this~matter, please advise. ~in~ely, ;? ~J H~ow~d~~L paff(~or~ ~ v;[ ~,.~ - Utilities S~perintendent / HLP/dm cc: Steven G. Goram, Director of Public Works Ken Griffin, City Engineer Attachments TRINITY RIVER AU[HORITY OF TE'~'''-, NORTHERN REGION PROJECTS REQUEST FOR A POINT OF ENTRY CONTRACTING PARTY: PROPOSED PROJECT NAME: DESIGN ENGINEER: CONTACT: TELEPHONE NO.: LOCATION OF PROPOSED CONNECTION (TRA NOMENCLATURE). NOTE: DETAILS CONCERNING TRA INTERCEPTORS ARE AVAILABLE FROM THE INDIVIDUAL PROJECT BUT SHOULD BE FIELD VERIFIED PRIOR TO SUBMITTAL. PROJECT: CRWS TMCRWS ROCRWS DCRWS INTERCEPTOR: STATION NO.: PLANNED LAND USE FOR THE AREA TO BE SERVED: ACREAGE: INITIAL FLOW EXPECTED: MGD (DAILY AVERAGE) MGD (PEAK) ULTIMATE FLOW EXPECTED: MGD (DAILY AVERAGE) MGD (PEAK) BASIS FOR ESTABLISHING FLOWS: 'TYPE OF CONNECTION: EXISTING MANHOLE: CONSTRUCT MANHOLE: SIZE OF CONNECTION: SLOPE AT CONNECTION: MATERIAL OF CONNECTION: METERING FACILITY PROPOSED? YES NO IF YES, EASEMENT DOCUMENTS FOR THE METER STATION, ACCESS ROAD AND PERMANENT ELECTRIC UTILITY MUST ACCOMPANY THIS REQUEST. TYPE:" ATTACHMENTS ACCOMPANYIi~G THIS REQUEST CONTAIN: (PLEASE CHECK)~ CONNECTION: METERING FACILITY: PLAN SHEETS PLAN SHEETS PROFILE SHEETS PROFILE SHEETS SPECIFICATIONS CONSTRUCTION PRINTS CONSTRUCTION SPECIFICATIONS INSTRUMENTATION SUBMITTALS GENERAL: SERVICE AREA MAP TO INCLUDE DRAINAGE AREA, CITY BOUNDARIES, AND NAME OF DEVELOPMENT REQUEST TO BE SIGNED BY THE CONTRACTING PARTY: 'NAME: SIGNATURE: DATE: TITLE: CONTRACTING PARTY: ~ REQUESTS WITHOUT THE ABOVE INFORMATION WILL BE DELAYED UNTIL ALL THE INFORMATION IS RECEIVED. TRA PROJECT NOMENCLATURE AND ADDRESS OF PROJECT ARE REPRESENTED AS FOLLOWS: Central Regional Wastewater System Ten Mile Creek Regional Wastewater P.O. Box 531196 System Grand Prairie, Texas 75053-1196 Malloy Bridge Road, Route 2, Box 136 Ferris, Texas 75125 Tarrant County Water Supply Project Denton Creek Regional Wastewater ll201Mosier Valley Road System Euless, Texas ?6039 P.O. Box 1259 Roanoke, Texas 76262 Red Oak Creek Regional Wastewater System TRINITY RIVER AUTHORITY OF TEXAS PERMIT REQUEST FORM Submit Permit Request To: (Check The Appropriate TRA Project) Central Regional Wastewater System (CRWS) Technical Services Engineer P.O. Box 531196 Grand Prairie, Texas 75053-1196 (214) 263-2251 or (214) 262-5186 Tarrant County Water Supply Project (TCWSP) Project Manager 11201 Nosier Valley Road Euless, Texas 76039 (817) 267-4226 or (817) 267-4227 Ten Nile Creek Regional Wastewater System (TMCRWS) Project Manager Malloy Bridge Road, Route 2, Box 136 Ferrts, Texas 75125 (214) 225-3462 or (214) 225-5538 Denton Creek Regional Wastewater System (DCRWS) Project Manager P.O. Box 1259 Roanoke, Texas 76262 (817) 430-4657 Red Oak Creek Regional Wastewater System (ROCRWS) Permit for construction to be issued to: (Title Owner of Property) Name Street City State Zip Code Telephone Contact: Name Telephone Number Permit for operation and maintenance to be issued to: (i.e., individual, developer, city) Name Street City State Zip Code Telephone Contact: Name Telephone Number Engineering Firm: Contact Name Telephone Number Street City Zip Code Details must be submitted on all proposed modifications of TRA facilities including plan and profile sheets of each crossing and initial and final ground elevations within the facility's easement boundary. Attachments: Plans and Profiles Location Map Proposed Project Name: Submitted by: Date: Telephone Number: Date of Plans: Proposed Project Start Date: PROPOSED PERMIT MODIFICATIONS Utility Crossin~ 1 2 3 SIZE TYPE CLEARANCE TRA FACILITY TRA STA NO. inch inch inch inch inch inch inch inch Pavements STREET NAME OR DRIVEWAY CLEARANCE TRA FACILITY TRA STA NO. Fill MAXIMUM AMOUNT FINAL OF FILL (ft} ELEVATION {ft} TRA FACILITY TRA STA NO. Excavation MAXIMUM AMOUNT FINAL OF EXCAVATION (ft) ELEVATION (ft) TRA FACILITY TRA STA NO. Manhole Adjustment FINAL HEIGHT ADJUSTED (ft) ELEVATION (ft) TRA FACILITY TRA STA NO. Miscellaneous TRA FACILITY TRA STA NO. CLEARANCE - the number of feet between the proposed modification and the Authority's facility. The clearance should indicate if the modifications are to be above, below or next to the Authority's facilities. TRA FACILITY - pertains to wastewater interceptors, water pipelines, meter stations, lift stations, etc... TRA facility plans may be obtained from the appropriate Project. 3 TRA STATION NUMBER - TRA station numbers can be obtained from the appropriate Project's as-built construction plans and must be included on the Permit Request Form. TRA USE ONLY NORTHERN REGION NUMBER: APPROVED BY: DATE: