Loading...
ST9302-LR010503 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR CITY OF COPPELL DATE 05/03/01 COPPELL, TEXAS PROJECT/f',IO. ST 93-02 J COPPELU l~S~.~~~ TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO DATEDE PTH'"'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 602 05/03/01 FG 6 12.5 111.2 12.5 110 99 1-A 603 05/03/01 FG 6 12.5 111.2 12.7 106 95 1-A 604 05/03/01 FG-1.0 6 12.5 111.2 12.5 113 102 1-A 605 05/03/01 FG-1.0 6 12.5 111.2 12.6 112 101 1-A 606 05/03/01 FG-1.0 6 12.5 111.2 12.5 113 101 1-A TEST LOCATION: RETAINING WALL AND UTILITY LINE BACKFILL 602 RETAINING WALL FRONT SIDE AT STATION #51+15 603 RETAINING WALL BACKSIDE AT STATION #51+15 604 UTILITY LINE BACKFILL AT PAVING STATION #100+00 605 UTILITY LINE BACKFILL AT PAVING STATION #97+00 606 UTILITY LINE BACKFILL AT PAVING STATION #95+00 C~ CITY OF COPPELL, ED BELL CONSTRUCTION i / / // NAL~uRALSUBGRADE *BA ~NE~L~AE~NETPCE~RMcPEAN~M~N~SDT~UER~NA(~TD~EMR~PLEYNTV~cT~HM~PPAE~T~F~A~MNPSLY~H SPECIFICATION~ Ily ~/St~cl~ed / ~ ~i EMME ESNT¢ TB IRL IE~.[~ D CDi RP~TR~TNT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ,~ [~1 NG.I~N C//' '/~"~// ......... 'e suits & rep ...... 'o, Ih .............. ,the CIiem ,:and their designated recipients on file ,n our office) and shall not be reproduced and/or distribut~'d exoep~f~lth res, approval offpHA Th .... our ~ame & test ~esulls must -ecelve our written approval Test results & reports apply only to the samples tested and/or observed and are not indicative of the quali~es of apparently idel~tlOa~jlfr similar specimens Geotechnica/ En,.~_meermg / Construction Materials Testing /-' Environmental Engineering / Consulting