2002_1119 WATER
Issued: $ - l i _ a Finished: Employee: (3e,( yes Grid Map:
Name: Address: ( c l Quail
Phone Number (HM): (WK):
Check For: Accuracy Test Meter Leak Check Water Pressure
Initial Meter Relocation Inspections Re -Read
1. Backflow Inso. 2. Repair 3. Maintenance 4. Other
Backflow Insp. A. Main Line A. Pump A. Line Locate
Bkflow Cert. Dace B. Valves B. Water Tower B. Line Locate
Re -Cert. Date C. Service Line C. Samples C. Tap
D. Hydrants D. Equipment D. Excavation
E. Safety
5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other
6, List of Safety Equipment at Site (if applicable):
A. Barricades B. Cones C. Tape D. Lights E. Other
REQUEST FOR SERVICES:
7. If Meter / Service Leak. Classify: City Customer
A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons
B. Was Water Metered: YES NO
C. Was Customer Notified: VERBALLY DOORKNOCKER
C) If Meter Change Out:
e�
A. Old Meter T d9 1 Uo G . Reading 1 5 1 y /o
B. New Meter # 3 ( 154 Reading
C. Old Meter Size / Type 13 etay /T 5 h New Meter Size / Type /mac;, s 51 e
E. Type of work performed or findings:
9. ft or deep service re ;air, describe type of pipe or service line ar.d condition:
10. Man hours: Crew members:
11. List materials used:
12. ff you had an accident/incident while performing this request, did you repot-. it? YES or NO
13. Water Utilities meta inspection: PASS or FAIL !
(4. How many trips to do task? 7
Signature