Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST9302-LR010427 (2)
ALPHA TESTING, INC. MECHANICAL 2209 Wisconsin St,, Suite 100 STABILIZATION / MODIFICATION Dallas, Texas 75229 FINAL MIX 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: CITY OF COPPELL DATE: 04/27/01 COPPELL, TEXAS PROJECT: SANDY LAKE ROAD OUR REPORT NO: 98881-189C PROJECT NO. ST 93-02 COPPELL, TEXAS AREA OF WORK: PAVING DATE CEMENT [ ] LIME IX ] INITIALLY APPLIED 04/23/01 DATE OF FINAL MIXING: 04/27/01 SAMPLE LOCATIONS: % PASSING % PASSING I 3~4" SIEVE # 4 SIEVE 1. PAVING ON SANDY LAKE ROAD AT STATION #54+50 100% 69% REMARKS: CC: NONE Our test results and reports are for the exclusive u~e of the client (and thmr designated recipients onfi~/ N oWl~tshe~xePcle~aSnc~PargerCr~oal iOnfd,~LatPwHtof tThh; qUuSael,tOlfesO~; ~p~aerea~qldy ti;Setn:i~ltosr simmU~llta;eCs~,eVce, mo;rnswritten approval Test~['esu, a'~;hrea~onr~ ab;il; !~Iritbe~;tt;~ ;xn~oPl G¢nt~.nhnl'¢,al F:nnin~,~rinn Fl ¢,nn.~trHnh'nn MRt~.rt'al~ T~.~finn fl F:nvirnnm~.nt~l Fnnin~.n'nn fl ¢,,nn.~i]lh'nn