SS9301-CS 930416 (3) THE GINN CORPORATION Co~s#lting E~gineers April 16, 1993 Mr. Ken Griffin City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Grapevine Creek Sewer Microtunneling Option Plan Revisions Dear Mr. Griffin: We have reviewed staff comments on the above referenced subject; and have addressed the concerns as follows: 1. The area at the end of the cul-de-sac (Sta. 95 +45), where concerns about tying the existing sewer line to the proposed line, is in a difficult location. At this point in time, we have no '"oetter" solution than what is shown. We have looked at different alternatives and determined that when construction is being done in that area, and existing facilities are exposed, then another solution may be determined. 2. Comment to re-calculate sewer length on new alignment. The new distances by "scaled" measurements, not surveyed, were determined. In actuality, the distances installed in the field will be basis for measurement and payment. 3. Regarding comment to show street cut areas with dimensions, it is difficult to tie down exactly the areas to be disturbed by the contractor. Contractor will be responsible for repairing or replacing any concrete he disturbs. 17103 Preston Road · Suite 205 · Dallas, Texas 75248 · Phone 214/248-4900 P.O. Box 796577 · Dallas, Texas 75379-6577 · FAX 214/931-1452 Mr. Ken Griffin Page 2 04/~6/93 4. With regards to comments about moving MH's so as to miss something, or so as not to block a street or driveway, we have no objections to having the manholes field adjusted. Profiles will not be affected much, but we caution that the manholes should not be relocated too far from where they are shown on the plans. 5. Details A & B on sheet 6 were deleted. Under separate cover, we are transmitting three sets of full size prints. Should you have any further questions or comments, please contact our office. Yours truly, H. Wayne Ginn, P.E. HWG:sb cc: Steve Goram Client File Reading File DRAFt