Loading...
ST8805-LR 890706SHIFLE'IT, /nc. ~ Construction Materials Engineering Division July 6, 1989 Coppell Independent School District 1201 Wrangler Drlve Coppell, Texas 75019 Atfn: Ns. Vonlta White Superlnfendent .ROJECT: Parkway BoUlevard & High School Access Road LOCAT,ON: Coppel I · Texas REPO.T.O: 892488--16 REPORT OF TESTS ON CONCRETE BEAMS SPECIFIED STRENGTH 650 psl e 28 days WEATHER CONDITIONS Clear CONCRETE SUPPLIER L. H. Lacy AIR TEMPERATURE g-%°F TRUCK NO. ---- CONCRETE TEMPERATURE 87 °F TICKET NO ---- CONCRETE UNIT WEIGHT ---- SAMPLED"Y LJ e 10: 45 am A,R CONTEHT 4.6% DATE Pt.CED 6--24--89 SLUMP 1 --1/2" LOCAT, O. OFP,-~CEMENT East Bound Parkway Blvd.; Sra. 54+00 BEAM FLEXURAL STRENGTH TESTS SEAM DATE AGE WIDTH DE~H SPAN LOAD F~XURAL NO. TESTED DAYS INCHES INCHES INCHES Las STRENGTH, PSI PWB-4 6-27-89 3 6 6 - 1/16 18 7200 590 F~/B-5 7-01-89 7 6 6 " 6800 565 PWB-6 (7-22-89) 28 ~B-7 (7-22-89) 28 TEST METHOD: ASTMC2S3OR C78 REMARKS: DISTRIBUTION: 1 Above 1 Jerry Parche' Consultlng Engineers 1 Cl~y of Coppell 1 L.H. Lacy Confracfors BAKER-SHIFLETF, INC. David R. Frlels· P.E. Texas 51700 5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411 KER. SHIFLE , In_ _ ,v~ion ~-~ '~ ~-~-?~[1111 Engineers ~ L~)1 I~I/ July 6, 1989 Coppell Independent School Dlstrict PROJECT: Parkway Boulevard & 1201 t~rangler Drive High School Access Road Coppel I, Texas 75019 .OCAT,O,: Coppel I, Texas A'l"l'n: Ns. Vonl'l'a White REPORT"O: 892488--17 Super I nten den'l' REPORT OF TESTS ON CONCRETE BEAMS SPEClFIEDSTRENGTH 650 psi ~ 28 days WEATHER CONDITIONS Clear CONCRETE SUPPLIER L · H. Lacy AIR TEMPERATURE 90°F TRUCK NO. ---- CONCRETE TEMPERATURE 90°F TICKET NO ---- CONCRETE UNIT WEIGHT SAMPLEOBY LJ ~ 3:45 pm AIRCONTENT DATE PLACED 6-24-89 SLUMP 1-1/2" LOCATION OF PLACEMENT North Bound High School Access Rd; S'l'a 17+50 BEAM FLEXURAL STRENGTH TESTS SEAM DATE AGE WIDTH DEPTH SPAN LOAD FLEXURAL NO. TESTED DAYS INCHES INCHES INCHES LBS STRENGTH. PSI IM~/B-8 6-27-89 3 6 6 18 7000 585 PWB-9 7-01-89 7 5 - 15/16 6 " 7200 605 PWB-10 (7-22-89) 28 " PWB- 11 . 28 TEST METHOD: ASTM C 293 OR C 78 REMARKS: DISTRIBUTION: 1 Above 1 Jerry Parche~ Consulting Engineers 1 Clfy of Coppell 1 L.H. Lacy Contractors BAKER-SHIFLETT, INC. David R. Frlels, P.E. Texas 51700 5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411 BAKER. SHIFLETT, /nc. __ ~----~-- Engineers Coppell Independent School Dls~P-arkway Boulevard & 1201 Wrangler Drive Hlgh School Access Road Coppel I · Texas 75019 LOCAT,O.: Coppel I · Texas Ns, Vonlta White Superintendent REPORT NO: 892488--18 REPORT OF TESTS ON CONCRETE BEAMS SPECIFIED STRENGTH 650 ps i e 28 days WEATHER CONDITIONS C I ear CONCRETE SUPPLIER L.H. Lacy AIR TEMPERATURE 90°F TRUCK NO, ~ CONCRETE TEMPERATURE 90°F TICKET NO ---- CONCRETE UNIT WEIGHT --- SAMPLEDBY LJ e 5: 15 pm A,. CONTENT --- DATEPL*CED 6-24-89 SLUMP 1--:~/4" LOCATION OF PLACEMENT Nor'th Bound High School Access Rd; Sta 15+50 BEAM FLEXURAL STRENGTH TESTS BEAM DATE AGE WIDTH DE~H SPAN LOAD FLEXURAL NO, TESTED DAYS INCHES INCHES INCHES ~S STRENGTH.~I PWB-12 6-27-89 3 6 - 1/16 6 18 6600 545 PWB-13 7-01-89 7 6 6 " 6800 565 PWB-14 (7-22-89) 28 " pt,/b-!5 . 28 " TEST METHOD: ASTMC293OR C78 REMARKS: DISTRIBUTION: 1 Above 1 Jerry Parchet Consulting Engineers 1 Gl'h/ of Coppell 1 L.H. Lacy Contractors BAKER-SHIFLE'FI', INC. David R. Frlels· P.E. Texas 51700 5450 East Loop 820 South P,O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411 ~ Construction Materials Engineering /nc. Engineers July 6, 1989 Coppell Independent School 1201 Wrangler Drive C~ppell, Texas 75019 At-fn: Ms. Vonl~a Whl+e Superln~enden~ PROJECT: LOCATION: Parkway Boulevard & High School Access Road Coppell, Texas REPORT NO: 892488--19 REPORT OF TESTS ON CONCRETE BEAMS SPEClFIEDSTRENGTH 650 psi e 28 days CONCRETE SUPPLIER L.H. Lacy TRUCK NO. TICKET NO ---- SAMP'EOaY LJ e 9:05 am DATE PLACED 6-24-89 LOCATION OF PLACEMENT WEATHER CONDITIONS AIR TEMPERATURE CONCRETE TEMPERATURE CONCRETE UNIT WEIGHT AIR CONTENT Clear 90°F 86DF SLUMP 1-1/4" Eas~ Bound Parkway Blvd.; S~a. 57+50 BEAM FLEXURAL STRENGTH TESTS SEAM DATE AGE WIDTH DEN. SPAN LOAD FLEXURAL NO. TESTED DAYS INCHES INCHES INCHES LBS STRENGTH. PSI ~rB-1 7-01-89 7 6 - 1/16 5 - 15/16 18 8700 730 ~B-2 (7-22-89) 28 ~B-3 " 28 REMARKS: 7 day flexural strengths comply wlfh proJect TESTMETHOD: ASTMC2g3ORC~ specifications unless noted otherwise. BAKER-SHIFLETT, INC. DISTRIBUTION: 1 Above 1 Jerry Parchet Consulting Engineers 1 Cl*y of Coppell 1 L.H. Lacy Contractors David R. Frlels, P.E. Texas 51700 5450 East Loop 820 South P.O, Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411 KER. SHIFLE7-r, /nc. ~~ ,- ,--= ~ ~__.,~ '~Engineers Coppell Independen-f School Dls-frlc'l' PROJECT= Parkway Boulevard 1201 Wrangler Drlve High School Access Road Coppel I. Texas 75019 .OCAT, O.: Coppel I, Texas A'l-'fn: Ns. Von !'fa Wh l'l'e HEPORT NO: 892488--20 Super ! n-fenden'l' REPORT OF TESTS ON CONCRETE BEAMS SPECIFIED STRENGTH 650 psi ~ 28 days CONCRETE SUPPLIER L.H. Lacy TRUCK NO. TICKET NO SAMPLED BY Tr ~ 1:45 pm DATE PLACED 6-27-89 LOCAT,O. OF PL*CEMENT Parkway B I vd.; WEATHER CONDITIONS W I ndy/CI oudy AIR TEMPERATURE 850 F CONCRETE TEMPERATURE 85 o F CONCRETE UNIT WEIGHT AIR CONTENT SLUMP 1--3/4' nor-fh s!de Sra. 55+00 BEAM FLEXURAL STRENGTH TESTS BEAM DATE AGE WIDTH DEPTH SPAN LOAD FLEXURAL NO, TESTED DAYS INCHES INCHES INCHES LBS STRENGTH. PS1 PWB-16 7-04-89 7 6 6 18 7200 600 I:'WB-17 (7-25-89) 28 F'WB- 1 8 " 28 TEST METHOD: ASTM C 293 OR C 78 REMARKS: DISTRIBUTION: 1 Above 1 Jerry Parche~ Consul-I'lng Eng!neers 1 Ci'l-y of Coppell 1 L.H. Lacy Con'l'rac'fors BAKER-SHIFLETT, INC. David R. Frlels, P.E. Texas 51700 5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411 _____ KER. SHIFLET'I', /nc. ~ Construction Materials Engineering Division~ ,, Coppell Independent School Dlstrl~=H~ .... PROJECT: 1201 Wrangler Drive Coppel I · Texas 75019 ,OCAT,ON: Engineers July 6, 1989 Parkway Boulevard & High School Access Road Coppell, Texas At"fn: Ns. Vonlta Whlte ,EPORTNO: 892488--21 Superintendent REPORT OF TESTS ON CONCRETE BEAMS SPECIFIED STRENGTH 650 ps I e 28 days WEATHER CONDITIONS W I ndy/CI oudy CO,CRETESUPPUE" L.H. Lacy AIR TEMPERATURE 85°F TRUCK NO. 35th I oad CONCRETE TEMPERATURE 85°F TICKET NO ---- CONCRETE UNIT WEIGHT m~ SAMPLED BY 'T'r ~ 3:00 pm A,R CONTENT --- DATEPLACED 6--27--89 SLUMP 2--1/4" LOCATION OF PLACEMENT Parkway Blvd.; north side Sta. 65+00 BEAM FLEXURAL STRENGTH TESTS BEAM DATE AGE WIDTH DEPTH SPAN LOAD FLEXURAL NO. TESTED DAYS INCHES INCHES INCHES LBS STRENGTH, PSi PWB-lg 7-04-8g 7 5 - 15/16 6 18 7400 625 PWB-20 (7-25-89) 28 F~B-21 " 28 TEST METHOD: ASTM C 293 OR C 78 REMARKS: BAKER-SHIFLETT. INC. 1 Jerry Parchet Consulting Engineers 1 City of Coppell David R. Frlels, P.E. 1 L.H. Lacy Contractors Texas 51700 5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411