ST8805-LR 890629~ Construction Materials Engineering Division
June 29. 1989
Coppell Independent School
.1201 #rangier Drive
Coppell, Texas 75019
AH'n: Hs. Vonl~a #hlte
Superintendent
PROJECT:
LOCATION:
Parkway Boulevard &
High School Access Road
Coppell, Texas
.E~O.T NO: 892488--13
REPORT OF TESTS ON CONCRETE BEAMS
SPECIFIED STRENGTH 650 psi e 28 days W~ATHERCONDITIONS Clear
CONCRETESUPPt. IER L H Lacy AIRTEMPE"ATURE 93"F
TRUCK NO. -- CONCRETE TEMPERATURE 87 eF
TICKET NO ---- CONCRETE UNIT WEIGHT ~
SAMPLEDBY LJ e 10:45 am AIRCONTENT 4.6%
DATE'~CED 6--24--89 SLUM' 1 I/2"
LOCAT,ONOFPU~CEME"~ East Bound Par'kvay Blvd.; $'l'a. 54+00
BEAM FLEXURAL STRENGTH TESTS
BEAM DATE AGE WIDTH DEPTH SPAN LOAD FLEXURAL
NO. TESTED DAYS INCHES INCHES INCHES LBS STRENGTH. PSI
F~B-4 6-27-89 3 6 6 - 1 / 16 18 7200 590
TEST METHOD: ASTM C 213 OR C 7~
REMARKS:
DISTRIBUTION:
1 Above
1 Jerry Parchet Consulting Engineers
1 City of Coppell
1 L.H. Lacy confracfors
BAKER-SHIFLE'R', INC.
Texas 51700
5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Melro 572-3411
BAKER. SHIFLETT, /nc.
~----..._____ Engineers
~ Co~struction Materials Engineering Division
June 29, 1989
Coppell Independent School Dlstrlc'l' PRO~ECT:
· 1201 tfrangler Drlve
Coppel I, Texas 75019.. LOCAT,ON:
Attn: Ns. Yon Ira Nh ite REPORT .0:
Super I ntendent
Parkway Boulevard &
High School Access Road
Coppell, Texas
892488-14
REPORT OF TESTS ON CONCRETE BEAMS
SPECIFIED STRENGTH 650 ps I e 28 days WEATHER COND~,O"~ CI ear
CONCRETE SUPPUER LH Lacy AIR TEMPERATURE 90°F
TRUCK NO. ~ CONCRETE TEMPERATURE 90OF
TICKET NO ---- CONCRETE UNIT WEIGHT
SAMPLED BY LJ e :~: 45 pm AIR CONTENT ---
DATE PI.'~CED 6--24--89 SLUMP I 1/2"
LOCATION OF PLACEMENT North Bound High School Access Rd; Sta. 17+50
BEAM FLEXURAL STRENGTH TESTS
BEAM DATE AGE WIDTH DEPTH SPAN LOAD FLEXURAL
NO. TESTED DAYS INCHES INCHES INCHES LBS STRENGTH, I~1
I~B-8 6-27-89 ;3 6 6 18 7000 585
TEST METHOO: ASTM C 2~a OR C 7S
REMARKS:
DISTRISUTION:
1 Above
1 Jerry Parchet Consulting Engineers
1 Cl~y of Coppell
1 L.H. Lacy Contractors
BAKER-SHIFLE'R', INC.
David R. Frlels, P.E.
Texas 51700
5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411
KER. SHIFLE'IT, Inc.
~~ ._,._.---Engineers
~ Construction Materials Engineering Division
June 29, 1989
Coppell Independent School District
1201 Wrangler Orlve
Coppel I, Texas 75019
A~-tn= Ms. Vonlta White
Superintendent
PROJECT:
LOCATION:
Parkway Boulevard &
High School Access Road
Coppell, Texas
REPORT NO: 892488-
REPORT OF TESTS ON CONCRETE BEAMS
SPECIFIED STRENGTH 650psi e 28 days WEAT. E, CONOmoNS Clear
CONCRETESUPI~UE" L H Lacy *IRTEM,'ERATU"E 90*F
~.UCK NO. ---- CONC.~ ~M~[.~TU~ 90 ~ F
TICKET NO ---- CONCRETE UNIT WEle~ ----
SABP~DBY LJ e 5:15 pm AmCON~ ----
O*TE ~CED 6-24-89
L~A~ONOF~CEME~ ~h BOund High Sch~i ~ccess Rd; S~. 1~+50
BEAM FLEXURAL STRENGTH TESTS
SEAM DATE AGE WIDTH DEPTH SPAN LOAD FLEXURAL
NO. TESTED DAYS INCHES INCHES INCHES LB~ STRENGTH, PSI .
F'~-12 6-27-89 ;3 6 - 1/16 6 18 6600 545
TEST METHOD: ASTM C 2S3 OR C ~
REMARKS:
DISTRIBUTION:
1 Above
1 Jerry Parchet Consulting Engineers
1 City of Coppell
1 L.H. Lacy Contractors
BAKER-SHIFLETT, INC.
David R. Frlels, P.E.
Texas 51700
5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411