Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST8805-LR 890606
SHIFLET'T, /nc. ~ Construction Materials Engineering Division neers June 6, 1989 Coppell Independent School 1201Nrangler Drive Coppell, Texas 75019 Dlstrlc~ PROJECT: Parkway Boulevard & High School Access Road tOCAT,ON: Coppel I. Texas A?tn: Ms. Vonl~a Whl~e RE.O.,NO: 892488-12 Super I ntendent REPORT OF TESTS ON CONCRETE CYLINDERS CL*SS OF CO.C.ET~ 3000 ps I WEATHER CONDITIONS C I ear/If I ndy CONCRETE SUPPUER Freeway AIR TEMPERATURE 88°F TRUCK.O. 709 CONCRmTEMPE.ATURE 84°F ~cK. NO. 2904 CO.CRET~ U.~T W~IS.T --- SAMPLED BY Tr ~ 3:20 pm A,R CONTENT ---- LOCATION OF PLACEMENT Drain Inlet'; S'l'a 58~'l~?'~'~u'l'h of Park Blvd CL CYLINDER COMPRESSIVE STRENGTH TESTS CYLINDER TESTEn SLUMP AGE DATE DATE TOTAL COMPRESSIVE INCHES DAYS PLACED TESTED LOAD, LBS STRENGTH, P~I NO. BY IASTM C143 ' ~TM C-~/AASHTU T-2~ PW-4 RD 3 7 5-08-89 5-15-89 100,000 3540 PW-5 RD " 28 " 6-05-89 123,000 4350 Pt'/-6 RD " 28 " " 117.000 4140 STD. S~ x 12" AREA 28.27 in.t REMARKS: 28 day compressive s'l'reng'l'hs comply wl'l'h proJec'l' spec ! f Ica'l' Ions un l ess no'l'ed o'l'herw 1se. BAKER-SHIFLETT. INC. 1 Above ' 1 Jerry Parchet ~nsul~lng Engineers At,n: Mr. Jerry Parchet, P.E. Glenn C. Goss, P.E. 1 CI~ of ~ppell Texas 49386 ~n: Mr. Larry Davls 1 L.H. Lacy ~n~rac~ors ~n: Mr. Skip Kle~n~ 5450 East Loop 820 South P.O. Box 15822 Fort Worth, Texas 76119 (817)478-8254 Melro 572-3411