Loading...
ST8805-LR 890605 ~0888 Shady Trail P.O. Box541297 Dallas, Texas 75354-1297 214/357-0146 LETTER OF TRANSMITTAL To General Contractors WE ARE SENDING YOU I~itached I-'1 Under separate cover via [] Shop drawings [] Prints [] Plans [] Samples r'] Copy of letter [] Change Order [] the following items: [] Specifications THESE ARE TRANSMI'Iq'ED as checked below: [] For approval [] Aproved as submitted [] Resubmit  se [] Approved as noted [] Submit ted [] Returned for corrections [] Return copies for approval copies for distribution corrected prints For review and comment [] COPY TO 00004 SIGNED: If enclosures are not noted, kindly notify us at T ) //7 ' Maxim I:ngineers. Inc. Engineering and Environmental Consultants 2342 Fabe~ P.O Box 599-02 Dallas. Texas 75229 214 247 7575 800 526 2946 General Report Repod Date TO PrOlect Iclentificat~on Method of Test 06/05/89 ~mpm Date 06/02/89 L.H. Lacy C~mpany Parkway Blvd. & High School Access ~oad - Job #344 - Coppell, Tex~__-~ Sieve Analysis of Course Aggregate AS~24 C-136 ResuEs On the above sample date, a representative of Maxim Engineers, Inc. obtained a sample of the oourse aggregate fxo~a the stock pile at L.H. Lacy Ccm~3any's plant located at Dent~n Tapp ~d. A sieve analysis was performed with the following Stardard Sieve Size 2" 1 1/2" 3/4" 1/2" 3/8" 1/4" ACe3_ml Percent ~ C-33 size #467 lOO. o lOO 100.0 95 - 100 72.0 45.0 35 -- 10 22.2 13.7 10 -- 30 Technician: P. Sanders ~.oHo Lacy ~ Maxim Engineers, Inc.