Loading...
ST8504-CS 920923COPPELL PUBLIC WORKS DATE: TO: FROM: RE: September 23, 1992 Larry Dav s, Construction rnspecto I~/ Rey Gonzales, Street SuperintendentS/ Riverchase Drive - Acceptance Street Division staff has performed the walk through follow-up as requested, and have found all the items noted, completed as required. According to you and the contractor, the two-year maintenance bond has been received as well. Please forward Public Works a copy of the two-year bond, as built plans and final acceptance letter. RG/bc STRIVER.RG