ST8504-CS 920921The City With A Beautiful Future
September 21, 1992
P.O. Bo 4~
Coppetl, Texas 75019
214-462-0022
Mr. Mike Daniel, P.E.
Nathan D. Maier
Three Northpark
8800 N. Central Expressway, Ste. 300
Dallas, TX 75231
Re:
Riverchase II & III
Final Acceptance
Dear Mike:
A final inspection of the above referenced project has been confirmed by representatives of the
City of Coppell subject to the various maintenance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard requirements. Erosion protectton will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter (September 21, 1993).
Maturity on the Erosion Control Bond will be two years from this letter (September 21, 1994).
Construction Inspector
cc:
Steve Goram, Director of Public Works
Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, Civil Engineer
G-reg Jones, Acting Building Official
Phillip Cullum, Cullum Construction
Jimmy Whatley, Austin Bridge and Road, Inc.
riverfin