Loading...
ST8504-CS 920820COPPELL PUBLIC WORKS M~MORANDUM DATE: TO: FROM: RE: August 20, 1992 Larry Davis, Construction Inspector Il/ Howard L. Pafford, Utilities Superintendent~- Walk Through RiverchaSe Phases I & II (Water/Sanitary Sewer) Field personnel performed a walk through on the above referenced project and find the following items to be deficient. 1. Sta. 57+00 - Fire hydrant leaking at lower gasket. 2. Sra. 51 + 90 - Fire hydrant leaking at lower gasket and possibly at bottom on shoe. 3. Sra. 20 + 00 - Regrout and wipe inside ring on manhole. 4. Sta. 42 + 00 - Fire hydrant leaking around open nut. Please ensure each of these items are corrected and maintenance bonds and as built plans are received prior to acceptance of this project. HLP/dm RIVERCHAS. HLP