Loading...
2002_0826 WATER Issued: c t 2 ` 4Z Finished: Employee: f Grid Map: Name: Address: 573 Pco--k Phone Number (HM): (WK): Check For. Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Bask 3. Maintenance 4. Q Backflow Insp. A. Main Line A. Pump A. Lane Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: A l a w rt B � t/3 `t'S o +' e ► 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORXNOCKER 8. If Meter Change Out: A. Old Meter 4 S 1 3 2 2 3 Reading / 5s tal 14 0 B. New Meter 4 3 'IC / S Reading __ C. Old Meter Size / Type f rP.4 • 4 im 3 f New Meter Size / Type 'ef 5 7gyYfe E. Type of work performed or Endings: 9. If mainline or deep service re a:. describe type of pipe or service line and condition: 10. Man hours: r! Crew members: 11. List materials used: 12. If you had an accident'incident `:i - • orming this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? Si lure