Loading...
ST8504-CS 920428The City With A Beautiful Future April 28, 1992 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Mike Daniel, P.E. Nathan D. Maier Three Northpark 8800 N. Central Expressway, Ste. 300 Dallas, TX 75231 Re: Riverchase Drive Phase I Dear Mr. Daniel: As per our conversation on April 20, 1992, this letter will serve as the official acceptance letter for the following parts of the Riverchase Development: 1) The entire water line as constructed from MacArthur Blvd. to Sandy Lake Road. This water line system has been tied into the City water system since its construction in the late 1980's. 2) The portion of the sanitary sewer, street and drainage contained within Phase I. Phase I is considered to be the section from Station 38 + 72 to MacArthur Blvd. It is our understanding that the sanitary sewer and storm drainage system was constructed for the entire street section. However, t~e City will not be in a position to accept the sanitary sewer system in Phases II and III until it has been televised. Also, the City will not be in a position to accept any of the drainage facilities in Phases II and .III until the inlet tops have been constructed. I hope this letter has answered the issues raised in your April 15, 1992 letter concerning the acceptance of these facilities. If you should have any questions or need any additional information, please feel free to contact me at your convenience. Sincerely, Kenneth ~. Griffin~ P.E. City Engineer cc: Steve Goram, Director of Public Works Larry Davis, Engineering Development Inspector