Loading...
2002_0813 WA TER Issued: �-i 3 -D i�Finished: Employee: A Grid map: Name: Address: aO Iv k 0 cAx tp i t`ul Phone Number: (HM) (WK) Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cen. Date B. Valves B. Water Tower B. Line Locate Re-Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter/Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used C>f Meter Cha ge Out: Unit # Miles Hrs Equipment A. Old Meter # a.5,3 Col Reading 1 5 9 G L1 B. New Meter # 315 1 335 Reading -'9— C. Old Meter Size,Type: Qygdyyr,r 5/W D New Meter SizeiType ry s }r -5 /' E. Type of work performed or faidings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: Post -it® Fax Note 7671 Date q113 (p 1 To yy I ( itt\j5mi IL From Debi VT- ,� PJr/1 IN Co. /Dept. W l R I U. l to6 Co. i, 11- r l] r ( S t 12. If you had a:: ac: :den. Incident while performing Phone # Phone # 1 G Fax # Fax # 13. Water Utili ties meter inspection: pass 14. How many :rips to do task? Signature V