ST8504-CS 880705The City With A Beautiful Future
PROJECT NAME:
PRE-CONSTRUCTION PACKET
DATE:
TIME:
P.O. Box 478
Coppell, Texas 75019
214 - 462 - OO22
ATTENDANCE SHEET
COMPANY:
PHONE:
(1)
PROJECT NAME:
DATE:
CITY OF C0 'ELL
PRE-CONSTRUCTION CONFERENCe,
ASSIGNED INSPECTOR:
I. ATTENDANCE:
(See Attached List)
II. PLANS FURNISHED TO:
A) CITY
B) CONTRACTOR
C) OWNER
YES / NO
YES / NO
YES J NO
III. UTILITY COMPANIES NOTIFIED:
A) TELEPHONE
B) GAS
C) ELECTRIC
D) CABLE T.V.
E) OTHER
//
IV.
STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
EASEMENTS
~IT
BORING PERMIT
YES ~/NO
YES NO
YES NO
YES NO
YES ~NO
Ve
INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
Be
AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
RATES".
CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY SEWER/STORM SEWER/
PAVING CONSTRUCTION BEGINS.
(2)
VI.
TESTING OF MATERIALS:
2.
3.
4.
DENSITIES
APPROVED CONCRETE BATCH DESIGN
CONCRETE PAVING INCLUDING CORES
APPROVED ASPHALT BATCH DESIGN
VII.
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
STREET CLOSING REQUIRED: YES
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND
FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES NO
B. TRAFFIC DETOUR YES NO
C. WARNING LIGHTS YES / NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE
BARRICADES AND/OR REPLACE ANY BARRICADES, THE CON-
TRACTOR WILL BE CHARGED FOR THEIR TIME.
IX.
AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITer.
X. INFORMATION:
DEVELOPER:
NAME: ~'~ Iffz~-
CONSULTING ENGINEER:
NAME:
ADDRE S S:
PHONE:
(3)
Xe
GENERAL CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
UTILITY CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
GENERAL:
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
DATE
AS-BUILT DRAWINGS - PAVING, DRAINAGE
1 - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SHEET COMPLETED/
STREET ASSESSMENTS
WATER AND SEWER FINALED
PAVING AND DRAINAGE FINALED
DEVELOPMENT INSPECTION FEE:
LETTER OF ACCEPTANCE WRITTEN
DATE:
LETTER OF ACCEPTANCE WILL NOT BE WRITTEN UNTIL THE PUNCH LIST MADE FROM
THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE
DEPARTMENTS.
THIS INCLUDES SUBMITTING:
AS-BUILTS, BONDS, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS.
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO
THE CITY OF COPPELL ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS
ARE RECEIVED.
COR-TEN BOLTS IN FITTINGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
,,~ VALVES AND HYDRANTS - 4~ BURY ON HYDRANTS.
FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS).
COLOR CODE HUDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING
DEPARTMENT.
TEMPORARY SANITARY FACILITIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE COMMITTMENT.
LANDSCAPE MAINTENANCE AGREEMENT.
PRE.CNSTRCTN.
PZAGN
(5)